Komatsu Hydraulic Mining Excavator PC4000 Repair Service Manual

Make: 
Model: 
Price: US$ 55.00

Service repair manual for Komatsu Hydraulic Mining Excavator PC4000E-6, with all the technical information to maintain, diagnose, repair, and rebuild like professional mechanics.

Komatsu Hydraulic Mining Excavator PC4000E-6 workshop service repair manual includes:
* Numbered table of contents easy to use so that you can find the information you need fast.
* Detailed sub-steps expand on repair procedure information
* Numbered instructions guide you through every repair procedure step by step.
* Notes, cautions and warnings throughout each chapter pinpoint critical information.
* Bold figure number help you quickly match illustrations with instructions.
* Detailed illustrations, drawings and photos guide you through every procedure.
* Enlarged inset helps you identify and examine parts in detail.

GZEBM08165-0 - Hydraulic Mining Excavator PC4000E-6 (Serial Number 08165 and up) Shop Manual.pdf
NOTE: "40 Troubleshooting & 50 Disassembly and Assembly" BLANK, NO CONTENTS!

PRODUCT DETAILS:
Total Pages: 832 pages
File Format: PDF (Internal Links, Bookmarked, Table of Contents, Searchable, Printable, high quality)
Language: English

TABLE OF CONTENTS
COVER.......1
00 Foreword .......3
  Introduction.......5
  Safety.......10
01 Specification.......31
  Specification PC4000.......33
10 Structure, Function.......41
  CONTENTS.......43
  SAFETY.......45
  ENVIRONMENT PROTECTION.......47
  FOREWORD.......48
  1. MAIN ASSEMBLY GROUPS.......59
    1.0 General Layout.......60
    1.1 Superstructure.......63
      1.1.1 Machine House.......65
      1.1.2 Hydraulic Oil Reservoir.......67
      1.1.3 Hydraulic Oil Cooler.......69
      1.1.4 Fuel Tank.......71
      1.1.5 Counter weight.......73
      1.1.6 Cab Support.......75
      1.1.7 Operator’s Cab.......77
      1.1.8 Control Blocks.......79
      1.1.9 Swing Gears.......81
    1.2 Undercarriage.......83
    1.3 Attachment.......85
      1.3.1 Backhoe Attachment (BHA).......85
      1.3.2 Front Shovel Attachment (FSA).......88
  2. DRIVE.......89
    2.0 Prime Drive Assembly.......91
    2.1 Flexible coupling.......93
    2.2 Pump Distributor Gearbox (PTO).......95
    2.3 Pump spline shaft lubrication.......97
    2.4 PTO Lubrication and Cooling.......99
    2.5 PTO Lubrication and cooling.......101
    2.6 Hydraulic pumps.......104
  3. Hydraulic Oil Reservoir.......105
    General lay out.......105
    3.1 Main oil tank, location of switches, sensors etc........109
    3.2 Suction oil tank with strainers.......111
    3.3 Return oil collector tube with strainer.......113
    3.4 Back pressure valve.......115
    3.5 Transfer pump (Optional Equipment).......117
      3.5.1 Evacuation of the suction oil reservoir.......121
      3.5.2 Evacuation of the return oil collector pipes and cooler circuit.......125
      3.5.3 Evacuation of the back-pressure valve pipe.......127
    3.6 Return and Leak Oil Filter.......129
    3.7 Breather filter.......131
  4. HYDRAULIC OIL COOLING.......133
    4.1 General.......135
    4.2 Function of the hydraulic oil cooling circuit.......137
    4.3 Adjustment of the Back Pressure Valve.......139
    4.4 Fan drive (Two stage cooler fan RPM control).......141
    4.5 Pressure relief valves and solenoid valve.......143
    4.6 Fixed Displacement Pump, with variable setting.......147
    4.7 Adjustment of the cooler fan drive speed.......149
  5. CONTROLLING.......155
    5.0 General lay out.......157
    5.1 Control and filter panel location of components.......159
    5.2 Pilot Pressure Supply and Adjustments.......163
    5.3 Remote control valves arrangement.......169
    5.4 Function principle of the Electro-Hydraulic- Proportional Control.......171
    5.5 Potentiometer Control (Lever, Joy Stick).......175
    5.6 Potentiometer Control (Pedal).......177
    5.7 Proportional Amplifier Module, Type A.......179
    5.8 Proportional Amplifier Module, Type B.......181
    5.9 Ramp Time Module.......183
    5.10 Adjustments of Amplifier Modules (General).......185
    5.11 Adjusting the Amplifiers Type B, illustration (Z 21642).......187
    5.12 Adjusting the Amplifiers Type B, illustration (Z 21643).......191
    5.13 Adjusting the Ramp Time Module.......195
  6. COMPONENTS.......203
    6.1 Hydraulic.......203
      6.1.1 Main Control Blocks and High Pressure Filter.......205
      6.1.2 Main Control Blocks and High Pressure Filter.......207
      6.1.3 Distributor Manifold - Location of restrictor blocks and anti cavitation valves.......209
      6.1.4 Distributor Manifold - Location of restrictor blocks and anti cavitation valves.......211
      6.1.5 Single Control Blocks (Floating) for Stick and Boom.......213
      6.1.6 Restrictor Block with Pressure Relief Valve.......215
      6.1.7 Anti Cavitation Valve Block.......217
      6.1.8 Remote control valves.......219
      6.1.9 Directional Solenoid Valves (Three positions / 4-ways).......221
      6.1.10 Proportional Solenoid Valve.......223
      6.1.11 High Pressure Filter.......225
      6.1.12 Control Blocks and Valves.......227
      6.1.13 Travel Brake Valve.......239
      6.1.14 Pressure Reducing Valve.......241
      6.1.15 Directional Solenoid Valves (Two positions / 4-ways).......243
      6.1.16 Pressure Increasing Valve.......245
      6.1.17 Hydraulic Cylinder.......247
  7. MAIN HYDRAULIC PUMPS AND PUMP REGULATION.......249
    7.0 Main hydraulic pumps and pump regulation system.......251
    7.1 Main Pumps.......259
    7.2 Electronic Pump Regulation System.......289
      7.2.1 Electronic load limiting control.......289
      7.2.2 Electronic Power Module EPM.......291
      7.2.2 Electronic Signal Rectifier ESR.......293
      7.2.2 Electronic Signal Rectifier ESR.......295
      7.2.2 Microcontroller MC7.......297
      7.2.3 Checks and adjustments Microcontroller MC7.......299
    7.3 Hydraulic Constant Regulation System.......345
    7.6 Energy Efficiency.......349
  8. OPERATING HYDRAULICS.......355
    8.0 General.......357
      8.1 Hydraulic for the attachment cylinder FSA and BHA.......361
        8.1.1 Electric / Hydraulic flowchart “ Boom raising ” FSA.......363
        8.1.1 Electric / Hydraulic flowchart “ Boom raising ” BHA.......365
        8.1.2 Electric / Hydraulic flowchart “ Boom lowering ” FSA.......367
        8.1.2 Electric / Hydraulic flowchart “ Boom lowering ” BHA.......369
        8.1.3 Electric / Hydraulic flowchart “ Stick extending ” FSA.......371
        8.1.3 Electric / Hydraulic flowchart “ Stick extending ” BHA.......373
        8.1.4 Electric / Hydraulic flowchart “ Stick retracting ” FSA.......375
        8.1.4 Electric / Hydraulic flowchart “ Stick retracting ” BHA.......377
        8.1.5 Electric / Hydraulic flowchart “ Bucket filling ” FSA.......379
        8.1.5 Electric / Hydraulic flowchart “ Bucket filling ” BHA.......381
        8.1.6 Electric / Hydraulic flowchart “ Bucket emptying ” FSA.......383
        8.1.6 Electric / Hydraulic flowchart “ Bucket emptying ” BHA.......385
        8.1.7 Electric / Hydraulic flowchart “ Clam opening ” FSA.......387
        8.1.8 Electric / Hydraulic flowchart “ Clam closing ” FSA.......389
        8.1.9 Checks and adjustments of the Main Relief Valves (MRV).......391
        8.1.10 Checks and adjustments of the Service Line Relief Valves (SRV).......395
        8.1.11 Checks and adjustments of the lowering speed.......439
    8.2 Hydraulic for the swing circuit.......459
      8.2.1 Swing Circuit.......461
      8.2.2 Swing Motor.......465
      8.2.3 Swing Gear Box.......469
      8.2.4 Swing Parking Brake (Gear house Brake).......471
      8.2.5 Swing Brake Valve.......473
      8.2.6 Electric / Hydraulic flowchart “Swing Left”.......477
      8.2.7 Electric / Hydraulic flowchart “Swing Right”.......479
      8.2.8 Checks and adjustments for the swing circuit.......481
      8.2.9 Function check for hydraulic swing brake.......487
      8.2.10 Function check for the swing parking brake.......489
    8.3 Hydraulic for the swing circuit.......491
      8.3.1 Travel Circuit.......493
      8.3.2 Travel Motor.......497
      8.3.3 Rotary Distributor.......499
      8.3.4 Travel gear.......501
      8.3.5 Travel parking brake (Gear house brake).......503
      8.3.6 Travel Brake Valve.......505
      8.3.7 Electric / Hydraulic flowchart “ Traveling forward ”.......507
      8.3.8 Electric / Hydraulic flowchart “ Traveling backward ”.......509
      8.3.9 Checks and adjustments for the travel circuit.......511
      8.3.10 Function check for the travel parking brake.......513
  9. HYDRAULIC TRACK TENSIONING SYSTEM.......515
    9.0 General.......517
    9.1 Functional description.......519
    9.2 Pressure Increasing Valve.......523
    9.3 Tensioning cylinder.......525
    9.4 Adjustments / Checks.......527
    9.5 Functional Test.......533
  10. ACCESS LADDER HYDRAULICALLY OPERATED.......535
    General.......537
    10.1 Function of hydraulically operated access ladder.......539
    10.2 Adjustments / Checks.......543
  11. CABLE DRUM.......545
    General.......547
    11.1 Components.......549
    11.2 Function.......551
      11.2.1 Controlling of the drive motor.......551
      11.2.2 Travel motion control.......553
      11.3 Checks and Adjustments.......555
      11.4 Description and operating instruction for cam switch 5S4 and 5S6.......557
  12. HINTS FOR READING THE HYDRAULIC DIAGRAM.......559
    General.......561
    12.1 Symbols.......563
    12.2 Legend for the circuit diagram.......575
  13. HINTS FOR READING THE ELECTRIC CIRCUIT DIAGRAM.......583
    13.1 Designation of electrical devices.......585
    13.2 Symbols.......587
    13.3 General information.......591
    13.4 Reading a Circuit Diagram.......595
  14 ELECTRONIC CONTROL SYSTEM (ECS).......599
    14.1 General Design of the ECS System.......601
      14.1.1 Input and Output of the PLC.......603
      14.1.2 Task.......603
      14.1.3 PLC DIGSY.......605
      14.1.4 Definitions; Symbols and Abbreviations.......607
    14.2 How to Proceed due Maintenance and Installation.......613
      14.2.1 Meaning of the Status LED’s.......617
      14.2.2 Short Circuit Marker -LED “MK”.......621
      14.2.3 Diagnostic for Temperature-Module “ANM”.......623
    14.3 Front Connector Arrangement.......625
      14.3.1 Front Connector Arrangement, BIM Module.......625
      14.3.2 Front Connector Arrangement, ANM-Module.......629
      14.3.3 Ground connection of the Control Unit.......633
      14.3.4 Interface-connection COM SK / SP.......635
    14.4 Power supply.......637
      14.4.1 Operation Voltages +24 V.......637
      14.4.2 Safety Precautions for Faultfinding.......639
      14.4.3 CPU Voltage Range.......641
    14.5 Function explanations with electrical diagram.......643
      14.5.1 General.......643
      14.5.2 Pressure Measuring (Hydraulic System).......645
      14.5.3 Temperature Measuring and trouble shooting.......647
      14.5.4 Temperature – Resistance Chart PT100.......651
    14.6 Hints for reading the functional flow charts.......653
      14.6.1 General.......653
      14.6.2 Example: Monitoring the X1-pressure for pump control.......655
    Lubrication System.......657
      General Function.......659
      Function of a lubrication cycle.......661
      Oscillation Cylinder and Control Block.......665
      Adjustments.......667
      One line system.......669
      Electrical function.......673
      Capacitive analog sensor for lubricant level monitoring.......677
      Adjustments.......679
      Function Pinion type (dummy wheel) system.......683
      Capacitive analog sensor for lubricant level monitoring.......691
      Hydraulically driven “Power Master III” lube pump.......697
      Trouble shooting.......699
      Lubricant Injector (metering valve).......701
      End-line switch.......707
      In-line filter.......709
      Vent valve.......711
    14.7.1.3 MTC-FIRMWARE AND SOFTWARE.......713
    14.7.1.4 VIEW ONTO THE MTC UNIT AND ITS CONNECTORS.......714
    14.8 GLOBAL LAYOUT OF THE INTERNAL CAN BUS.......716
      14.8.1 GENERAL INFORMATION ABOUT A CAN BUS SYSTEM.......716
        14.8.1.1 GENERAL CAN BUS DESCRIPTION.......717
        14.8.1.2 CAN BUS TROUBLESHOOTING.......717
        14.8.1.3 CAN BUS WIRING.......718
        14.8.1.4 CAN BUS END RESISTOR.......720
    14.9 THE NODES IN THE CAN BUS SYSTEM.......722
      14.9.1 GLOBAL LAYOUT.......722
      14.9.2 INTRODUCTION.......723
        14.9.2.1 ICN-V FEATURES.......724
        14.9.2.2 ICN-D FEATURES.......725
      14.9.3 NODE DIP-SWITCHES.......726
      14.9.4 NODE BOX.......727
      14.9.5 NODE LOCATIONS ON THE MACHINE.......728
        14.9.5.1 NODE & LOCATION CHART.......729
        14.9.5.2 EXEMPLARY VIEW ONTO LOCATION 11 (CAB BASE).......730
  15. AUTOMATIC LUBRICATION SYSTEMS.......733
    15.1 Introduction.......777
    15.2 Central Lubrication System (CLS).......778
    15.3 Lubrication Pump Station (SLS).......784
      15.3.1 Hydraulically driven Lube Pump.......790
      15.3.2 Vent Valve.......792
      15.3.3 End of Line Switch.......794
      15.3.4 In-Line Filter.......796
      15.3.5 Lubricant Level Sensor.......798
      15.3.6 Lubricant Pressure Sensor.......799
      15.3.7 Lubricant Injector.......800
      15.3.8 Lubrication pinion.......805
    15.4 Operating and Controlling.......807
      15.4.1 Operating Flow, Electrical Flow.......808
    15.5 Adjustments.......812
      15.5.1 Pump Speed and Working Pressure.......813
      15.5.2 Injectors.......816
      15.5.3 End of Line Switch Setting CLS.......818
      15.5.4 End of Line Switch Setting SLS.......820
    15.6 Troubleshooting.......822
    15.7 Commissioning.......826
      15.7.1 Commissioning of the CLS.......826
      15.7.2 Fine Adjustment.......827
      15.7.3 Commissioning of the SLS.......827
40 Troubleshooting.......831
50 Disassembly and Assembly.......832

Komatsu Hydraulic Mining Excavator PC4000 Repair Service Manual

Logo