KOBELCO CK2000, CKE1800 Crawler Cranes OPERATION & MAINTENANCE Manual

Make: 
Price: US$ 35.00

Complete OPERATION & MAINTENANCE Manual with Parts Catalog for KOBELCO CK2000, CKE1800 Crawler Cranes.

KOBELCO CK2000, CKE1800 Electrical Circuit Chart.pdf
S2JC10003ZE09 - KOBELCO CK2000 Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf
S3JC00003ZO01 - KOBELCO CK2000 Crawler Crane Parts Manual.pdf
S5JC00002ZE05 - KOBELCO CK2000, CKE1800 Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf

PRODUCT DETAILS:
Total Pages: 1,812 pages
File Format: PDF (Internal Links, Bookmarked, Table of Contents, Searchable, Printable, high quality)
Language: English

TABLE OF CONTENTS
KOBELCO CK2000, CKE1800 Electrical Circuit Chart....1
S2JC10003ZE09 - KOBELCO CK2000 Crawler Crane OPERATION & MAINTENANCE MANUAL....34
  COVER....34
  TABLE OF CONTENTS....36
  IMPORTANT INFORMATION....42
  1. SAFE OPERATING PRACTICES FOR MOBILE CRANES....72
  2. OPERATION....92
    2.1 TERMINOLOGY OF MACHINE EACH PART....92
      2.1.1 CRANE ATTACHMENT....92
      2.1.2 LUFFING JIB ATTACHMENT....93
    2.2 LOCATIONS AND TERMS OF OPERATING CONTROLS....94
      2.2.1 OPERATING SWITCHES....98
      2.2.2 GAUGE CLUSTER CONFIGURATION....107
      2.2.3 OPERATING THE AIR CONDITIONER....120
      2.2.4 AM/FM RADIO (OPTION)....122
    2.3 CRANE OPERATION....124
      2.3.1 ADJUSTING THE OPERATOR'S SEAT....124
      2.3.2 ADJUSTING THE CONTROL LEVER DIRECTION....124
      2.3.3 STARTING AND STOPPING THE ENGINE....125
      2.3.4 FUNCTION LOCK LEVER....128
      2.3.5 PROPELLING OPERATION....129
      2.3.6 SWINGING OPERATION....131
      2.3.7 BOOM RAISING/LOWERING OPERATION....134
      2.3.8 HOOK RAISING/LOWERING OPERATION....136
    2.4 FREE FALL OPERATION....139
    2.5 LUFFING JIB OPERATION....142
      2.5.1 JIB RAISING/LOWERING OPERATION....143
      2.5.2 HOOK HOIST DRUM CONTROL....145
    2.6 HANDLING OF REEVING WINCH (OPTION)....147
  3. LOAD SAFETY DEVICE....150
    3.1 ARRANGEMENT OF EQUIPMENTS....150
    3.2 TYPE AND FUNCTIONS OF EQUIPMENTS....154
    3.3 CONNECTING PROCEDURE OF WIRING....160
      3.3.1 CRANE ATTACHMENT....160
      3.3.2 LUFFING ATTACHMENT....165
    3.4 FUNCTION OF CONTROLLER/MONITOR....170
    3.5 OPERATING PROCEDURE OF CONTROLLER....174
      3.5.1 SETTING SCREEN....175
      3.5.2 SETTING OF THE CRANE CONFIGURATION....181
      3.5.3 SELECTION OF MAIN/JIB/AUX. LIFTING....186
      3.5.4 SETTING OF WORKING AREA LIMIT VALUE....187
      3.5.5 SETTING OF THE TIME....191
    3.6 WARNING ALARM AND AUTOMATIC STOP....193
      3.6.1 ITEMS OF WARNING ALARM AND AUTOMATIC STOP....193
      3.6.2 CONTENTS OF AUTOMATIC STOP....195
      3.6.3 RELEASE OF AUTOMATIC STOP....200
    3.7 INSPECTION....207
      3.7.1 INSPECTION BEFORE RAISING THE BOOM AFTER ASSEMBLY OF ATTACHMENT IS COMPLETED....207
      3.7.2 INSPECTION AFTER ERECTING THE ATTACHMENT....213
    3.8 CAUTION FOR HANDLING THE LOAD SAFETY DEVICE....214
    3.9 INDICATION OF ERRORS AND REMEDY....215
    3.10 INDICATION OF MESSAGE AND ALARM....216
    3.11 CONFIRMATION OF FUNCTION FOR LOAD SAFETY DEVICE....218
  4. ASSEMBLY OF THE MACHINE....220
    4.1 STABILITY IN SWINGING AND TRAVELING....220
      4.1.1 WITHOUT BOOM BASE....220
      4.1.2 WITH BOOM BASE....222
    4.2 TRANSLIFTER....223
      4.2.1 COMPOSITION OF THE TRANSLIFTER....223
      4.2.2 HANDLING TRANSLIFTERS (1) - (4)....224
    4.3 UNLOADING THE BASE MACHINE....227
      4.3.1 ERECTING THE GANTRY....228
      4.3.2 SETTING THE TRANSLIFTERS....229
      4.3.3 UNLOAD THE BASE MACHINE FROM THE TRAILER....232
      4.3.4 INSTALLATION OF THE HOOK BLOCK TO THE BASE BOOM....233
    4.4 INSTALLATION OF THE CARBODY WEIGHT....235
    4.5 INSTALLATION OF THE CRAWLER....238
      4.5.1 INSTALLATION OF THE FIRST CRAWLER....238
      4.5.2 INSTALLATION OF THE SECOND CRAWLER....242
    4.6 ASSEMBLING THE ATTACHMENT....244
      4.6.1 ASSEMBLY OF THE BOOM....244
      4.6.2 ASSEMBLY OF THE JIB....253
      4.6.3 INSTALLATION OF THE AUXILIARY SHEAVE....259
    4.7 ASSEMBLING THE LUFFING ATTACHMENT....260
      4.7.1 ARRANGEMENT OF BOOM / LUFFING JIB / GUY LINE....262
      4.7.2 CONNECTING LUFFING BOOM TIP ASSEMBLY....272
      4.7.3 INSTALLING THE AUXILIARY SHEAVE FOR LUFFING....273
      4.7.4 ASSEMBLING THE LUFFING JIB....274
      4.7.5 INSTALLING STRUT GUY LINE....275
    4.8 INSTALLATION OF THE COUNTERWEIGHT....276
      4.8.1 ASSEMBLING THE COUNTERWEIGHTS....276
      4.8.2 REMOVING THE HOOK BLOCK FROM THE BASE BOOM....279
      4.8.3 SETTING THE COUNTER-WEIGHT LINK....280
      4.8.4 INSTALLATION OF COUNTERWEIGHTS TO MACHINE....281
    4.9 CONNECTING THE BOOM....286
      4.9.1 CONNECTING THE BASE BOOM TO THE INSERT BOOM....286
      4.9.2 INSTALLATION OF THE GUY LINE....287
    4.10 ASSEMBLING THE LUFFING JIB ATTACHMENT....291
      4.10.1 INSTALLING LUFFING JIB HOIST WIRE ROPE....291
      4.10.2 CONNECTING STRUT GUY LINE....291
      4.10.3 INSTALLING STRUT BACKSTOP....292
      4.10.4 INSTALLING JIB GUY LINE....293
    4.11 REEVING THE WIRE ROPE FOR CRANE, JIB AND AUXILIARY SHEAVE....294
      4.11.1 REEVING THE FRONT DRUM WIRE ROPE FOR CRANE WITHOUT LUFFING JIB....294
      4.11.2 REEVING REAR DRUM WIRE ROPE TO THE JIB....298
      4.11.3 REEVING THE REAR DRUM WIRE ROPE TO THE AUXILIARY SHEAVE....300
    4.12 REEVING THE WIRE ROPE FOR CRANE WITH LUFFING ATTACHMENT....301
    4.13 ERECTING THE ATTACHMENT....304
      4.13.1 CONNECTING THE SAFETY DEVICE (Refer to Chapter 3.)....304
      4.13.2 CONFIRMATION BEFORE ERECTING THE ATTACHMENT....304
      4.13.3 ERECTING THE ATTACHMENT....305
      4.13.4 CHECK BEFORE STARTING THE WORK....306
    4.14 ERECTING THE LUFFING ATTACHMENT....307
      4.14.1 CONNECTING SAFETY DEVICE....307
      4.14.2 CONFIRMATION BEFORE ERECTING THE LUFFING ATTACHMENT....310
      4.14.3 ERECTING LUFFING ATTACHMENT....311
      4.14.4 CHECK BEFORE STARTING THE WORK....314
  5. DISASSEMBLY OF THE ATTACHMENT....316
    5.1 LOWERING THE ATTACHMENT....318
      5.1.1 LOWERING THE ATTACHMENT....318
    5.2 LOWERING THE LUFFING ATTACHMENT....319
      5.2.1 LOWERING THE ATTACHMENT....320
    5.3 WINDING UP THE FRONT DRUM/REAR DRUM WIRE ROPES....323
    5.4 REMOVING JIB GUY LINE....324
      5.4.1 REMOVE THE JIB GUY LINE OF THE FRONT STRUT SIDE....324
      5.4.2 REMOVE THE JIB GUY LINE OF THE REAR STRUT SIDE....325
    5.5 DISCONNECTING THE WIRING FOR SAFETY DEVICE....327
    5.6 REMOVING THE BOOM GUY LINE....330
      5.6.1 INSTALLATION OF THE UPPER SPREADER TO THE BOOM BASE....330
      5.6.2 REMOVE THE BOOM GUY LINE....330
    5.7 REMOVE THE COUNTER-WEIGHTS....331
      5.7.1 DISCONNECT THE BOOM BASE FROM THE INSERT BOOM....331
      5.7.2 REMOVE THE COUNTERWEIGHTS FROM THE MACHINE....332
      5.7.3 INSTALLATION OF THE HOOK BLOCK TO THE BOOM BASE....336
      5.7.4 DISASSEMBLY OF THE COUNTERWEIGHT....337
    5.8 DISASSEMBLING THE ATTACHMENT....339
      5.8.1 DISASSEMBLING THE JIB....339
      5.8.2 REMOVING GUY LINES....341
      5.8.3 REMOVING UPPER AND INSERT BOOMS....342
    5.9 DISASSEMBLY OF LUFFING ATTACHMENT....342
      5.9.1 DISASSEMBLING THE LUFFING JIB....343
      5.9.2 DISASSEMBLING THE LUFFING BOOM TIP ASSEMBLY....344
      5.9.3 CAUTION WHEN TRANS-PORTING LUFFING BOOM TIP ASSEMBLY....345
    5.10 REMOVAL OF THE CRAWLERS....346
      5.10.1 SETTING THE TRANSLIFTER (Refer to 4.3.1.)....346
      5.10.2 REMOVAL OF THE CRAWLERS....346
    5.11 REMOVAL OF THE CARBODY WEIGHTS....351
    5.12 REMOVAL OF THE HOOK BLOCK FROM BASE BOOM....352
    5.13 LOADING THE BASE MACHINE....353
      5.13.1 LOADING THE BASE MACHINE ON THE TRAILER....353
      5.13.2 FOLDING THE TRANSLIFTER....353
      5.13.3 LOWERING THE GANTRY....355
      5.13.4 CAUTION WHEN TRANSPORTING THE BASE MACHINE....356
      5.13.5 TRANSPORTATION OF NO.1 COUNTERWEIGHT AND LADDER....356
  6. WIRE ROPE....358
    6.1 UNREELING WIRE ROPE....358
      6.1.1 UNREELING WIRE ROPE....358
      6.1.2 WINDING WIRE ROPE ONTO DRUM....359
      6.1.3 INSTALLING THE ROPES....361
      6.1.4 SPECIFICATION OF WIRE ROPE....361
      6.1.5 WIRE ROPE LENGTH....362
  7. MAINTENANCE....366
    7.1 INSPECTIONS....371
      7.1.1 UPPER STRUCTURE PARTS AND DEVICES TO BE INSPECTED....371
        7.1.1.1 UPPER STRUCTURE INSPECTIONS-DAILY OR EVERY 8 HOURS....373
        7.1.1.2 UPPER STRUCTURE INSPECTIONS-MONTHLY OR EVERY 100 HOURS....378
        7.1.1.3 UPPER STRUCTURE INSPECTIONS-SEMI-ANNUALLY OR EVERY 600 HOURS....382
        7.1.1.4 UPPER STRUCTURE INSPECTIONS-WEEKLY OR EVERY 50 HOURS....383
      7.1.2 LOWER STRUCTURE PARTS AND DEVICE TO BE INSPECTED....385
        7.1.2.1 LOWER STRUCTURE INSPECTIONS-DAILY OR EVERY 8 HOURS....386
        7.1.2.2 LOWER STRUCTURE INSPECTIONS-MONTHLY OR EVERY 100 HOURS....387
        7.1.2.3 LOWER STRUCTURE INSPECTIONS-QUARTERLY OR EVERY 250 HOURS....389
        7.1.2.4 LOWER STRUCTURE INSPECTIONS-SEMI-ANNUALLY OR EVERY 600 HOURS....389
      7.1.3 ATTACHMENT PARTS AND DEVICES TO BE INSPECTED....391
        7.1.3.1 ATTACHMENT INSPECTIONS-DAILY OR EVERY 8 HOURS....393
      7.1.4 REPLACEMENT STANDARDS FOR WIRE ROPE....397
    7.2 OIL/GREASE SUPPLY AND WATER SERVICE....402
      7.2.1 UPPER STRUCTURE LUBRICATION (INCLUDING WATER SUPPLY)....405
      7.2.2 LOWER STRUCTURE LUBRICATION....407
      7.2.3 ATTACHMENT LUBRICATION....409
      7.2.4 GREASE....411
      7.2.5 ENGINE OIL....419
      7.2.6 FUEL....420
      7.2.7 COOLANT....421
      7.2.8 HYDRAULIC OIL....423
      7.2.9 GEAR OIL....426
    7.3 CLEANING/WASHING/CHANGING FILTER ELEMENT AND STRAINER....431
    7.4 BATTERY INSPECTION....442
    7.5 LOCATION AND USE OF FUSE....445
    7.6 OPERATION UNDER UNUSUAL CONDITIONS....447
    7.7 MACHINE STORAGE....449
    7.8 TIGHTENING TORQUE VALUES....450
    7.9 SECURITY PARTS TO BE REPLACED PERIODICALLY....452
    7.10 ADJUSTMENT....453
      7.10.1 ADJUSTMENT OF FRONT AND REAR DRUM LOCKS....453
      7.10.2 ADJUSTMENT OF BOOM DRUM LOCK....454
      7.10.3 ADJUSTMENT OF THIRD (LUFFING JIB) DRUM LOCK....455
      7.10.4 CRAWLER SHOES ADJUSTMENT....455
    7.11 CONSUMABLE PARTS LIST....456
  8. REFERENCE MATERIALS....462
    8.1 SPECIFICATION....462
      8.1.1 PERFORMANCE....462
      8.1.2 PERFORMANCE OF LUFFING JIB....462
      8.1.3 OUTSIDE DIMENSIONS....463
    8.2 DIMENSIONS AND WEIGHT OF EACH PARTS....465
      8.2.1 BASE MACHINE....465
      8.2.2 COUNTERWEIGHT....466
      8.2.3 ATTACHMENT....467
    8.3 SYSTEM SCHEMATIC....473
      8.3.1 HYDRAULIC SYSTEM SCHEMATIC....473
      8.3.2 ELECTRIC SYSTEM SCHEMATIC....475
  9. INITIAL ASSEMBLY OF THE MACHINE....490
    9.1 UPPER STRUCTURE (WITH CARBODY) LIFTING PROCEDURES....491
      9.1.1 INSTALLATION OF BOOM FOOT LIFTING BRACKET....491
      9.1.2 INSTALLATION....492
    9.2 LOADING/UNLOADING OF THE MACHINE FROM/ONTO A TRAILER....493
      9.2.1 LOADING ONTO A TRAILER....493
      9.2.2 UNLOADING FROM A TRAILER....493
    9.3 INSTALLATION OF THE CARBODY WEIGHT....497
    9.4 INSTALLATION OF THE CRAWLER....498
      9.4.1 INSTALLATION OF THE FIRST CRAWLER....498
      9.4.2 INSTALLATION OF THE SECOND CRAWLER....503
    9.5 INSTALLATION OF THE GANTRY TO THE SWING FRAME....505
    9.6 INSTALLATION OF THE BOOM BASE....508
      9.6.1 REMOVAL OF THE BACKSTOP....508
      9.6.2 INSTALLATION OF THE BOOM BASE....508
    9.7 INSTALLATION OF THE BACKSTOP....510
    9.8 INSTALLING THE UPPER AND LOWER SPREADER....511
S3JC00003ZO01 - KOBELCO CK2000 Crawler Crane Parts Manual....518
  COVER....518
  CONTENTS....523
  CONTROL SYSTEM....0
    MONITOR INSTAL....579
    LUB. LINES FOR DRUM LOCK (BOOM)....577
    LUB. LINES (FRONT / REAR)....575
    DRUM LOCK ASSY (BOOM)....573
    DRUM LOCK ASSY (FRONT / REAR)....571
    LAMP & SWITCH ASSY (WITH FREE FALL)....569
    PANEL ASSY (BYPASS SWITCH)....567
    PANEL ASSY....565
    PANEL ASSY (LEFT STAND)....563
    LABEL ASSY....561
    PANEL ASSY (LEFT STAND)....559
    PANEL ASSY....557
    BRAKE PEDAL ASSY....553
    GRIP ASSY (BOOM)....551
    SWING LOCK ASSY....549
    REMOTE CONTROL V.INSTAL (BOOM / FRONT / REAR)....547
    CONTROL LEVER ASSY (PROPEL / FUNCTION LOCK)....545
    CONTROL LEVER ASSY (SWING)....541
    CONTROL LEVER ASSY (BOOM / MAIN / AUX.)....537
    CONTROL ASSY....533
  WINCH SYSTEM (WITH FREE FALL)....0
    WINCH INSTAL (WITH FREE FALL (FRONT / REAR)....581
    WINCH ASSY (FRONT)....583
    WINCH ASSY (REAR)....585
    WINCH ASSY....587
  WINCH SYSTEM (WITHOUT FREE FALL)....0
    WINCH INSTAL  (WITHOUT FREE FALL / FRONT & REAR)....589
    WINCH INSTAL (FRONT)....591
    WINCH ASSY (REAR)....595
    REDUCTION UNIT ASSY....599
  BOOM HOIST SYSTEM....0
    WINCH INSTAL (BOOM)....603
    WINCH ASSY....605
    REDUCTION UNIT ASSY....607
  SWING SYSTEM....0
    REDUCTION INSTAL, SWING....609
    SWING MOTOR ASSY....611
    SWING REDUCTION ASSY....613
    SWING BEARING ASSY....615
    SWING BEARING LUB. LINES....617
  LINES....0
    PUMP HYD. LINES (SUCTION)....619
    PUMP HYD. LINES (CONTROL)....621
    PUMP HYD. LINES (DELIVERY)....625
    RIGHT DECK HYD. LINES....627
    MAIN VALVE CONTROL HYD. LINES....633
    SWING MOTOR HYD. LINES....635
    SWING MOTOR HYD. LINES (BLOCK)....639
    ACCUMLATOR HYD. LINES....641
    FLOOR PLATE HYD. LINES....643
    FLOOR CONTROL HYD. LINES....645
    BRAKE HYD. LINES....649
    BRAKE CONTROL HYD. LINES....651
    4-SECTION VALVE HYD. LINES....653
    3-SECTION VALVE HYD. LINES....655
    HYD.CONTROL LINES....657
    DRAIN HYD. LINES....659
    RETURN BLOCK HYD. LINES....663
    2-SECTION VALVE HYD. LINES (SWING MODE / PROPEL SPEED SELECT)....665
    2-SECTION VALVE HYD. LINES (FUNCTION CUT / SWING PARKING BRAKE)....667
    4-SECTION VALVE HYD. LINES....669
    5-SECTION VALVE HYD. LINES....671
    8-SECTION VALVE HYD. LINES....673
    WINCH HYD. LINES (FOR FRONT&REAR DRUM)....675
    WINCH HYD. LINES (FOR BOOM)....679
    COOLING HYD. LINES....681
    CONNECTOR ASSY (MANIFOLD)....685
    CONNECTOR ASSY (WINCH)....687
    OIL COOLER HYD. LINES....689
    CLAMP ASSY....691
    LOWER HYD. LINES....695
    SWIVEL JOINT INSTAL....699
    SWIVEL JOINT....701
    HYD. OIL TANK ASSY....703
    HYD. OIL TANK ASSY....705
  POWER PLANT....0
    POWER PLANT ASSY....711
    PUMP INSTAL....717
    POWER DIVIDER....719
    MUFFLER INSTAL....721
    FUEL LINES....723
    RADIATOR INSTAL....725
    AIR CLEANER INSTAL....727
    FUEL TANK ASSY....729
  ELECTRIC SYSTEM....0
    ELEC ASSY (RIGHT DECK)....731
    ELEC ASSY (REV. FRAME)....735
    ELEC ASSY (FLOOR PLATE)....739
    RELAY BOX ASSY....743
    ELEC ASSY (L.H. GUARD)....745
    ELEC ASSY....747
    ELEC ASSY (LEFT DECK)....751
    RELAY ASSY....757
    WASHER TANK ASSY....759
    WASHER TANK INSTAL (OPTION)....761
    BATTERY INSTAL....763
  CAB / GUARD / PLATFORM....0
    CAB INSTAL....765
    CAB ASSY....769
    DOOR ASSY....777
    RUBBER SHEET INSTAL (OPERATOR’S ROOM)....783
    LOCK ASSY....785
    SUN VISOR ASSY....787
    ROLL BLIND....789
    SASH ASSY....791
    L.H. GUARD INSTAL....793
    L.H. GUARD ASSY....797
    L.H. GUARD ASSY....799
    L.H. GUARD ASSY....803
    INSULATION ASSY....805
    INSULATION ASSY....809
    DRUM COVER ASSY....811
    SWING BEARING COVER ASSY....813
    DRUM COVER (BOOM DRUM)....815
    SWING MOTOR COVER ASSY....817
    UNDER COVER ASSY (LEFT)....819
    UNDER COVER ASSY (RIGHT)....821
    AUX. PLATFORM ASSY (OPERATORS ROOM)....823
    AUX. PLATFORM ASSY....827
    RIGHT DECK INSTAL....829
    RIGHT DECK INSTAL (UNDER OF CAB)....831
    L.H. DECK INSTAL....833
    STEP  INSTAL (RIGHT DECK)....837
    HANDRAIL....839
    FRONT GUARD ASSY....841
  LOWER SYSTEM....0
    PROPEL MOTOR ASSY....843
    REDUCTION UNIT ASSY....845
    IDLER ASSY....847
    IDLER ADJUST ASSY....849
    ROLLER ASSY....851
    LOWER ROLLER ASSY....852
    UPPER ROLLER ASSY....853
    FRAME COVER ASSY....855
    CRAWLER FRAME CONNECTING PIN....857
    SHOE ASSY (42inch / OPTION)....861
    SHOE ASSY (48inch)....862
    TRANSLIFTER ASSY....863
    TRANSLIFTER HYD. LINES....865
  CRANE ATTACHMENT....0
    LOWER BOOM ASSY....869
    UPPER BOOM ASSY....873
    UPP. BOOM ASSY....875
    INSERT BOOM (3.0m (10ft))....877
    INSERT BOOM (6.1m (20ft))....878
    INSERT BOOM (9.1m (30ft))....879
    INSERT BOOM (12.2m (40ft))....880
    BOOM POINT SHEAVE ASSY....881
    BOOM POINT SHEAVE ASSY....883
    IDLER SHEAVE ASSY (ADD.FOR 3RD DRUM)....885
    IDLER SHEAVE ASSY....887
    SPREADER GUIDE ASSY....889
    GUY CABLE ASSY (φ30)(3.0m (10ft))(6.1m (20ft))(9.1m (30ft))....891
    GUY CABLE ASSY (φ30)(12.2m (40ft))....893
    CABLE ROLLER ASSY (FOR INSERT BOOM)....895
    BOOM POINT SHEAVE ASSY....897
    IDLER SHEAVE ASSY....899
    JIB ASSY....901
    INSERT JIB ASSY (3.0m (10ft))....903
    INSERT JIB ASSY (6.1m (20ft))....904
    STRUT ASSY....905
    JIB POINT SHEAVE ASSY....907
    JIB GUY CABLE (6.1m (20ft))(BOOM SIDE(WHEN 30ft INSERT BOOM)(WHEN 40ft INSERT BOOM)(FOR OFFSET ANGLE 30゜)(JIB SIDE)....909
    CABLE ROLLER ASSY (FOR INSERT JIB)....911
    UPPER SPREADER ASSY....913
    LOWER SPREADER ASSY....915
    BOOM BACKSTOP ASSY(LF & CR)....917
    BACKSTOP ASSY (CRANE)....921
    AUX. SHEAVE ASSY....925
    WIRE ROPE ASSY....927
  LUFFING CRANE....0
    LUFFING ASSY....929
    BOOM POINT SHEAVE ASSY....931
    IDLER SHEAVE ASSY....933
    FRONT STRUT ASSY....935
    STRUT SHEAVE ASSY....937
    REAR STRUT ASSY....939
    STRUT SHEAVE ASSY....941
    GUIDE SHEAVE ASSY....943
    LOWER JIB ASSY....945
    STRUT BACKSTOP ASSY....947
    BACKSTOP ASSY....949
    HYD. OIL TANK INSTAL....951
    HYD. OIL TANK ASSY....953
    HYD. OIL TANK....955
    JIB BACKSTOP ASSY....957
    UPPER JIB ASSY....961
    JIB POINT SHEAVE ASSY....963
    IDLER SHEAVE ASSY....965
    CABLE ROLLER ASSY....967
    INSERT JIB (3.0m (10ft))(6.1m (20ft))(12.2m (40ft))....969
    CABLE ROLLER ASSY (FOR LUFFING INSERT JIB)....971
    TRAVELING KIT....975
    GUY CABLE (φ30)(LUFFING BASE)....977
    GUY CABLE (φ30)(STRUNT BASE) ....978
    GUY CABLE (φ34)(3.0m (10ft))(6.1m (20ft))(12.2m (40ft))(LUFFING JIB BASE)....979
    GUY CABLE (φ34)....981
  GANTRY....0
    GANTRY ASSY....983
    SUB GANTRY ASSY....987
  REEVING WINCH....0
    REEVING WINCH INSTAL....991
    REEVING WINCH ASSY....993
    REEVING WINCH HYD. LINES....995
    GUIDE ROLLER INSTAL....999
    ROLLER INSTAL....1001
    GUIDE ROLLER INSTAL (OPTION)....1003
    ROLLER ASSY....1005
  JIB (THIRD) WINCH SYSTEM....0
    CONTROL ASSY (JIB)....1007
    DRUM LOCK ASSY (JIB)....1009
    DRUM LOCK LUB. LINES (JIB)....1011
    POTENTIOMETER INSTAL (FOR JIB DRUM)....1013
    JIB WINCH INSTAL....1015
    JIB WINCH ASSY....1017
    WINCH HYD. LINES (JIB / THIRD)....1021
    JIB / THIRD MAIN HYD. LINES....1023
    JIB / THIRD CONTROL HYD. LINES....1027
    4-SECTION VALVE HYD. LINES....1029
    5-SECTION VALVE HYD. LINES....1031
    VALVE INSTAL....1033
    JIB / THIRD CONTROL HYD. LINES....1035
    PLUG INSTAL....1037
    GANTRY SHEAVE ASSY (JIB)....1039
    DRUM COVER ASSY (JIB DRUM)....1041
    HARNESS ASSY (JIB)....1043
  OVEALOAD SAFETY DEVICE (LIM)....0
    SAFETY DEVICE HARNESS (FOR GANTRY)....1045
    SAFETY DEVICE HARNESS (FOR BASE MACHINE)....1049
    SAFETY DEVICE HARNESS (FOR BOOM BASE & INSERT BOOM)(FOR BOOM TIP)(FOR ANGLE DETECTOR)....1051
    SAFETY DEVICE HARNESS (FOR LUFFING)....1055
    SAFETY DEVICE HARNESS (FOR JIB)....1061
    HOOK OVERHOIST LIMIT SWITCH (FOR CRANE)....1063
    HOOK OVERHOIST LIMIT SWITCH (FOR LUFFING)....1065
    HOOK OVERHOIST LIMIT SWITCH (FOR AUX. SHEAVE & JIB)....1067
    HOOK OVERHOIST LIMIT SWITCH....1069
    LIMIT SWITCH ASSY....1071
    BOOM OVERHOIST LIMIT SWITCH....1073
  COUNTERWEIGHT / FRAME....0
    COUNTERWEIGHT ASSY....1075
    CARBODY WEIGHT....1077
    SWING ALARM ASSY....1081
    REVOLVING FRAME ASSY....1083
    RUBBER INSTAL....1085
    CARBODY ASSY....1089
    COUNTERWEIGHT REMOVAL DEVICE....1091
    PIN ASSY....1097
    HYD. LINES ASSY (FOR C/W REMOVAL)....1099
    VALVE INSTAL....1103
    VALVE INSTAL....1105
    REMOTE CONTROL ASSY....1107
  LABEL....0
    LABEL ASSY....1109
    LABEL ASSY (FOR LUFFING)....1119
  OTHERS....0
    AIR CONDITIONER (INDOOR UNIT)....1121
    AIR CONDITIONER (OUTDOOR UNIT)....1125
    UPPER FINAL (ENGINE CONTROL)....1129
    UPP. FINAL (SHEAT)....1133
    UPPER FINAL....1135
    UPPER FINAL....1137
    UPPER FINAL (PEDAL COVER)....1139
    TOOL ASSY....1141
    TOOL ASSY....1143
    SPARE PART KIT....1145
    SEAT ASSY....1147
    BOOM STEP ASSY (OPTION)....1149
    LIGHT INSTAL (OPTION)....1155
    BOOM FOOT PIN REMOVAL DEVICE....1159
    RADIO INSTAL....1161
    PEDAL ASSY....1163
    TRAVELING KIT....1165
    BRACKET ASSY (OPTION)....1169
    TRAVELING KIT (FOR INSERT BOOM GUY LINE / OPTION)....1171
    TRAVELING KIT (FOR INSERT JIB GUY LINE / OPTION)....1173
    DRUM TURN SENSOR INSTAL....1175
    SWITCH INSTAL (FOR DRUM TURN SENSOR)....1177
    DRUM TURN SENSOR GRIP INSTAL....1178
    GRIP ASSY....1179
    FAN INSTAL (15cm FAN / OPTION)....1181
    PEDAL ASSY (OPTION)(FOR BOOM & JIB CONTROL)....1183
    ANEMOMETER (ADD.PART FOR CRANE / OPTION)....1189
    BOOM NESTING (OPTION)....1197
    BOOM FOOT PIN REMOVAL DEVICE....1199
    PLATE ASSY....1201
    SLING (OPTION)....1203
    HEAD GUARD (OPTION)....1205
    ALARM ASSY (OPTION)....1207
    EXTINGUISHER INSTAL (OPTION)....1209
    NOISE FILTER (FOR WIPER MOTOR / OPTION)....1211
    PEDAL SENSOR INSTAL (OPTION)....1213
    BOOM CONTROL PEDAL INSTAL (OPTION)....1215
    LEVEL GAUGE INSTAL (OPTION)....1217
    LIFE HAMMER INSTAL (OPTION)....1219
  INDEX OF PART NO.....1222
S5JC00002ZE05 - KOBELCO CK2000, CKE1800 Crawler Crane OPERATION & MAINTENANCE MANUAL....1247
  COVER....1247
  TABLE OF CONTENTS....1249
  SAFETY....1257
  1. SPECIFICATION....1269
    1.1 CK2000 SPECIFICATION....1271
      1.1.1 PERFORMANCE....1271
      1.1.2 PERFORMANCE OF LUFFING JIB....1271
      1.1.3 OUTSIDE DIMENSIONS....1272
      1.1.4 DIMENSIONS AND WEIGHT OF EACH PARTS....1274
      1.1.5 WITHOUT BOOM BASE....1282
      1.1.6 WITH BOOM BASE....1284
    1.2 CKE1800 SPECIFICATION....1285
      1.2.1 PERFORMANCE....1285
      1.2.2 PERFORMANCE OF LUFFING JIB....1285
      1.2.3 OUTSIDE DIMENSIONS....1286
      1.2.4 DIMENSIONS AND WEIGHT OF EACH PARTS....1291
      1.2.5 WITHOUT BOOM BASE....1300
      1.2.6 WITH BOOM BASE....1302
  2. MAINTENANCE STANDARDSTEST PROCEDURES....1303
    2.1 MAINTENANCE STANDARD....1305
      2.1.1 PIN, BUSHING, SPRING, LINING AND SHEAVE....1305
      2.1.2 PROPEL DEVICE....1316
    2.2 PERFORMANCE STANDARD AND TEST PROCEDURE....1323
      2.2.1 OPERATING SPEED....1323
      2.2.2 POINT AND METHOD OF MEASURING PRESSURE....1324
      2.2.3 SLEWING RING....1328
  3. GENERAL WORK STANDARD....1329
    3.1 TIGHTENING TORQUE OF CAPSCREWS AND NUTS....1331
      3.1.1 METRIC COARSE THREADS....1331
      3.1.2 METRIC FINE THREADS....1331
      3.1.3 COARSE THREDS UNC....1332
      3.1.4 FINE THREADS UNF....1332
      3.1.5 TIGHTENING TORQUE OF HYDRAULIC FITTINGS....1333
    3.2 STANDARD PARTS....1335
      3.2.2 O-RING....1336
      3.2.3 BACK-UP RING....1337
      3.2.4 BITE FITTING....1338
    3.3 CONVERSION TABLE....1340
      3.3.1 UNIT CONVERSION....1340
      3.3.2 MILLIMETER : INCH CONVERSION TABLE....1341
      3.3.3 METER-FOOT CONVERSION TABLE....1343
      3.3.4 GRADIENT CONVERSION TABLE....1344
    3.4 TABLE OF UNIT WEIGHT....1345
  4. POWER TRAIN....1347
    4.1 INTRODUCTION....1349
    4.2 ENGINE....1351
      4.2.1 INTRODUCTION....1351
      4.2.2 REMOVAL....1351
      4.2.3 REPAIR AND MAINTENANCE....1352
      4.2.4 RE-INSTALLATION....1353
    4.3 PUMP DRIVE ASSEMBLY....1356
      4.3.1 INTRODUCTION....1356
      4.3.2 REMOVAL....1356
      4.3.3 DISASSEMBLING THE POWER DIVIDER....1358
      4.3.4 CHECK AND REPAIR OF THE POWER DIVIDER....1359
      4.3.5 ASSEMBLING THE POWER DIVIDER....1360
      4.3.6 RE-INSTALLATION....1361
  5. HYDRAULIC SYSTEM....1367
    5.1 HYDRAULIC CIRCUITS AND COMPONENTS....1369
    5.2 HYDRAULIC CIRCUIT....1370
    5.3 COMPONENT SPECIFICATION....1374
      5.3.1 LOCATION OF HYDRAULIC COMPONENTS....1378
    5.4 HYDRAULIC SYSTEM....1386
      5.4.1 PREFACE....1386
      5.4.2 OUTLINE....1386
      5.4.3 OIL FLOW FROM No.1 and No. 2 PUMPS....1388
      5.4.4 OIL FLOW FROM No.3 AND No.4 PUMPS....1390
      5.4.5 OIL FLOW FROM No.5 PUMP (CONTROL PUMPS)....1391
      5.4.6 OIL FLOW FROM No.6 PUMP (FOR AUXILIARY ACTUATOR CIRCUIT)....1394
    5.5 VALVES....1397
  6. HOIST SYSTEM....1405
    6.1 APPARATUS AND LOCATION OF COMPONENTS....1407
    6.2 CONSTRUCTION AND FUNCTION....1408
      6.2.1 HYDRAULIC SCHEMATIC....1408
      6.2.2 LIFTING A LOAD....1410
      6.2.3 HOLDING A RAISED LOAD....1412
      6.2.4 LOWERING A LOAD (POWERED LOWERING)....1414
      6.2.5 FREE FALL OPERATION....1417
      6.2.6 FREE FALL ACCELERATION....1420
    6.3 DRUM LOCK....1422
      6.3.1 ASEEMBLY DRAWING....1422
      6.3.2 ADJUSTMENT OF DRUM LOCK....1423
    6.4 WINCH ASSEMBLY....1424
      6.4.1 WINCH INSTAL....1424
      6.4.2 WINCH ASSEMBLY / REDUCTION UNIT WITHOUT FREE FALL (STD.)....1425
      6.4.3 WINCH ASSEMBLY WITH FREE FALL (OPT.)....1427
    6.5 BRAKE PEDAL....1428
      6.5.1 ASSEMBLY DRAWING....1428
      6.5.2 ADJUSTING THE BRAKE PEDAL....1430
    6.6 BLEEDING AIR FROM BRAKE CIRCUIT....1431
  7. BOOM HOIST SYSTEM....1433
    7.1 APPARATUS AND LOCATION OF COMPONENTS....1435
    7.2 CONSTRUCTION AND FUNCTION....1437
      7.2.1 HYDRAULIC SCHEMATIC....1437
      7.2.2 RAISING THE BOOM....1438
      7.2.3 NEUTRAL(MAINTAINING THE BOOM POSITION)....1440
      7.2.4 LOWERING THE BOOM....1442
    7.3 BOOM DRUM LOCK....1444
      7.3.1 ASSEMBLY DRAWING....1444
      7.3.2 ADJUSTING THE BOOM DRUM LOCK....1445
    7.4 DRUM AND REDUCTION UNIT....1446
      7.4.1 BOOM WINCH ASSEMBLY....1446
      7.4.2 BOOM DRUM AND REDUCTION UNIT ASSEMBLY....1448
  8. SWING SYSTEM....1451
    8.1 APPARATUS AND LOCATION OF COMPONENTS....1453
    8.2 CONSTRUCTION AND FUNCTION....1455
      8.2.1 HYDRAULIC SCHEMATIC....1455
      8.2.2 SWING....1456
      8.2.3 STOPPING....1460
    8.3 SWING REDUCTION UNIT....1464
    8.4 SWING BEARING....1466
    8.5 SWING LOCK....1468
  9. PROPEL SYSTEM....1469
    9.1 LOCATION OF THE MAJOR COMPONENTS....1471
    9.2 CONSTRUCTION AND FUNCTION....1472
      9.2.1 HYDRAULIC SCHEMATIC....1472
      9.2.2 PROPELLING (RIGHT SIDE FORWARD)....1474
      9.2.3 STOPPING....1476
    9.3 PROPEL REDUCTION UNIT....1478
      9.3.1 REDUCTION UNIT....1480
      9.3.2 MOTOR....1482
    9.4 ADJUSTMENT....1484
  10. ELECTRIC SYSTEM....1485
    10.1 ELECTRICAL WIRING SCHEMATIC....1487
    10.2 CONNECTOR LIST....1501
    10.3 ARRANGEMENT OF ELECTRICAL PART....1553
      10.3.1 ELECTRICAL PART OF CAB....1553
      10.3.2 ELECTRICAL PART OF RIGHT DECK....1557
      10.3.3 ELECTRICAL PART OF FLOOR PLATE & LEFT SIDE STAND PANEL....1561
      10.3.4 ELECTRICAL PART OF REVOLVING FRAME....1566
      10.3.5 ELECTRICAL PART OF LEFT DECK....1568
      10.3.6 ELECTRICAL PART OF LEFT GUARD....1574
      10.3.7 HARNESS PART NUMBER LIST (ALL MODELS)....1575
    10.4 ELECTRICAL PART....1577
      10.4.1 LOCATION AND USE OF FUSE....1577
      10.4.2 FUSE BOX (GG73E00004F1)....1579
      10.4.3 WIPER CONTROL RELAY(2480U1366)....1581
      10.4.4 SWING FLASHER UNIT (2480U306)....1582
    10.5 PRESSURE SWITCH(CONTROL PRESSURE CUT & FREE FALL)....1583
    10.6 PRESSURE SENSOR....1585
    10.7 RELAY BOX (GG24E00024F1)....1587
      10.7.1 ARRANGEMENT OF CONNECTOR....1587
      10.7.2 RELAY BOX SCHEMATIC....1589
    10.8 LEFT SIDE STAND PANEL (WITH FREE FALL)....1592
    10.9 BYPASS SWITCH PANEL....1596
    10.10 TROUBLESHOOTING OF EXHAUST GAS THIRD REGULATION ENGINE....1597
      10.10.1 FAILURE DIAGNOSIS FUNCTION....1597
      10.10.2 HOW TO CHECK THE FAILURE CONTENTS....1598
      10.10.3 CHECKING OF DIAGNOSIS LAMP FUNCTION....1603
      10.10.4 ENGINE ECU....1604
  11. LOAD SAFETY DEVICE....1607
    11.1 PART NAMES AND FUNCTIONS....1609
      11.1.1 FRONT VIEW....1609
      11.1.2 CONFIGURATION OF SCREENS....1614
      11.1.3 DATA TRANSMISSION BETWEEN CONTROLLER AND CARDS....1619
      11.1.4 DETAILS OF INDICATORS ON MAIN DISPLAY SCREEN....1621
      11.1.5 REAR VIEW....1625
      11.1.6 ITEMS REQUIRED TO BE EXECUTED FOR REPLACEMENT OF CONTROLLER OR DATA CARDAND INSTRUCTIONS(IN A SIMILAR MANNER TO UPGRADE OF PROGRAM)....1630
    11.2 PREPARATION FOR USE....1631
    11.3 TURN THE POWER ON....1632
    11.4 UPGRADING PROGRAMS....1633
      11.4.1 PROCEDURES....1633
      11.4.2 UPGRADING OF INDICATION PROGRAMS....1635
      11.4.3 UPGRADING OF CONTROL PROGRAMS....1638
    11.5 STATUS CHECK....1640
      11.5.1 SIGNAL CHECK....1641
      11.5.2 OPERATION PROGRESS....1643
      11.5.3 COMMUNICATION DATA....1646
      11.5.4 INDICATION OF ADJUSTMENT VALUE....1647
      11.5.5 TROUBLE RECORD....1656
      11.5.6 CHOICE OF LANGUAGE(CKE series only)....1658
      11.5.7 LOAD RECORD (LOAD RECORD IN THE MAIN MENU)....1659
    11.6 ADJUSTMENTS....1660
      11.6.1 REMOVING THE INNER PANEL....1660
      11.6.2 ADJUSTMENT....1661
      11.6.3 LOAD ADJUSTMENT....1682
      11.6.4 ADJUSTMENT DATA COPY (INITIALIZATION)....1684
      11.6.5 VERSION CHECK....1690
    11.7 ERROR CODE (ABNORMALITY DETECTION) AND COUNTERMEASURES....1691
    11.8 CONTROL OUTPUT....1695
    11.9 RELEASES....1707
      11.9.1 RELEASE FUNCTION....1707
    11.10 MECHANICAL SPECIFICATION....1715
      11.10.1 ENVIRONMENTAL PERFORMANCE PARAMETERS....1715
      11.10.2 LOAD CELL (CRANE)....1716
      11.10.3 ANGLE SENSOR....1717
      11.10.4 CONTROLLER....1719
    11.11 EXTERNAL DIMENSIONS....1723
    11.12 ELECTRIC SCHEMATIC DIAGRAM....1724
      11.12.1 CRANE TYPE....1724
      11.12.2 LUFFING TYPE....1725
    11.13 CONTROLLER MALFUNCTION EMERGENCY MEASURES....1726
    11.14 LOAD SAFETY DEVICE CHECK PROCEDURES....1727
  12. GAUGE CLUSTER....1729
    12.1 CONFIGURATION OF DISPLAY....1731
    12.2 PRIORITY....1732
    12.3 STATUS DISPLAY....1734
    12.4 FAULT LOG DISPLAY....1744
  13. TOTAL CONTROLLER....1749
    13.1 ARRANGEMENT OF TOTAL CONTROLLER....1751
    13.2 COMPOSITION OF SYSTEM....1752
      13.2.1 OUTPUT RELATION TO CONTROLLER....1753
    13.3 FUNCTION OF TOTAL CONTROLLER....1754
    13.4 TOTAL CONTROLLER (HARDWARE)....1780
      13.4.1 OUTLINE....1780
      13.4.2 SPECIFICATIONS OF TOTAL CONTROLLER OUTPUT....1781
      13.4.3 DETAILS OF TOTAL CONTROLLER CONNECTOR....1786
      13.4.4 ARRANGEMENT OF TOTAL CONTROLLER CONNECTOR PIN....1787
      13.4.5 PROPORTIONAL SOLENOID VALVE MEASURING POSITION....1794
    13.5 ADJUSTMENT OF TOTAL CONTROLLER....1796
      13.5.1 NECESSITY OF ADJUSTMENT....1796
      13.5.2 ADJUSTMENT PROCEDURES OF TOTAL CONTROLLER....1796
    13.6 CONTROLLER MALFUNCTION EMERGENCY MEASURES....1804
  14. AIR CONDITIONER....1805
    14.1 OPERATION ITEMS....1807
    14.2 SAFETY MONITOR FUNCTIONS....1808
    14.3 DISASSEMBLY AND ASSEMBLY PROCEDURE....1811
      14.3.1 SPECIAL CONSIDERATIONS DURING REPLACEMENT....1811
      14.3.2 INTERIOR UNIT....1813
    14.4 OPERATIONAL PRECAUTIONS....1822
    14.5 INSPECTION AND MAINTENANCE....1823
      14.5.1 INSPECTION/MAINTENANCE LIST....1823
      14.5.2 INSPECTION/MAINTENANCE PROCEDURES....1823
    14.6 ELECTRIC SYSTEM SCHEMATIC....1827
  15. TRANSLIFTER SYSTEM....1829
    15.1 LOCATION OF MAIN COMPONENTS....1831
    15.2 CONSTRUCTION AND WORKING PRINCIPLE....1834
      15.2.1 OUTLINE....1834
    15.3 WORKING PRINCIPLE....1836
      15.3.1 RAISING THE TRANSLIFTER....1836
      15.3.2 LOWERING THE TRANSLIFTER....1838
    15.4 REMOTE CONTROL SWITCH....1840
    
KOBELCO CK2000, CKE1800 Crawler Cranes OPERATION & MAINTENANCE Manual

Logo