KOBELCO CK1000-II, CKE900 Crawler Cranes OPERATION & MAINTENANCE Manual

Make: 
Price: US$ 35.00

Complete OPERATION & MAINTENANCE manual with Parts catalog for KOBELCO CK850-II Crawler Crane.

KOBELCO CK1000-2, CKE900-1 Electrical Circuit Chart.pdf
S2GH14011ZE09 - KOBELCO CK1000-II Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf
S2GH15001ZE03 - KOBELCO CK1000-II LUFFING Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf
S3GH10012ZO04 - KOBELCO CK1000-II Crawler Crane Parts Manual.pdf
S5GH00002ZE04 -  KOBELCO CK1000-II, CKE900 Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf

PRODUCT DETAILS:
Total Pages: 1,863 pages
File Format: PDF (Internal Links, Bookmarked, Table of Contents, Searchable, Printable, high quality)
Language: English

TABLE OF CONTENTS
KOBELCO CK1000-2, CKE900-1 Electrical Circuit Chart....1
S2GH14011ZE09 - KOBELCO CK1000-II Crawler Crane OPERATION & MAINTENANCE MANUAL....31
  COVER....31
  TABLE OF CONTENTS....33
  IMPORTANT INFORMATION....39
  1. SAFE OPERATING PRACTICES FOR MOBILE CRANES....49
  2. OPERATION....69
    2.1 TERMINOLOGY OF MACHINE EACH PART....69
    2.2 LOCATIONS AND TERMS OF OPERATING CONTROLS....70
      2.2.1 OPERATING SWITCHES....74
      2.2.2 GAUGE CLUSTER CONFIGURATION....82
      2.2.3 OPERATING THE AIR CONDITIONER....95
      2.2.4 AM/FM RADIO (OPTION)....97
    2.3 CRANE OPERATION....99
      2.3.1 ADJUSTING THE OPERATOR'S SEAT....99
      2.3.2 ADJUSTING THE CONTROL LEVER DIRECTION....99
      2.3.3 STARTING AND STOPPING THE ENGINE....100
      2.3.4 FUNCTION LOCK LEVER....104
      2.3.5 PROPELLING OPERATION....105
      2.3.6 SWINGING OPERATION....107
      2.3.7 BOOM RAISING/LOWERING OPERATION....109
      2.3.8 HOOK RAISING/LOWERING OPERATION....111
    2.4 FREE FALL OPERATION....114
    2.5 HANDLING OF REEVING WINCH (OPTION)....117
    2.6 HANDLING OF HYDRAULIC TAGLINE (OPTION)....119
  3. LOAD SAFETY DEVICE....121
    3.1 ARRANGEMENT OF EQUIPMENTS....121
    3.2 TYPE AND FUNCTIONS OF EQUIPMENTS....124
    3.3 CONNECTING PROCEDURE OF WIRING....129
      3.3.1 CRANE ATTACHMENT....129
    3.4 FUNCTION OF CONTROLLER/MONITOR....134
    3.5 OPERATING PROCEDURE FOR CONTROLLER....138
      3.5.1 SETTING SCREEN....139
      3.5.2 SETTING OF THE CRANE CONFIGURATION....144
      3.5.3 SELECTING MAIN/AUX LIFTING....150
      3.5.4 SETTING OF WORKING AREA LIMIT VALUE....151
      3.5.5 SETTING THE TIME....154
    3.6 WARNING ALARMS AND AUTOMATIC STOPS....156
      3.6.1 WARNING ALARMS AND AUTOMATIC STOP INDICATORS....156
      3.6.2 CONTENTS FOR AUTOMATIC STOP....157
      3.6.3 RELEASING AUTOMATIC STOP....159
    3.7 INSPECTION....165
      3.7.1 BEFORE RAISING THE BOOM (UPON COMPLETION OF ATTACHMENT ASSEMBLY)....165
      3.7.2 INSPECTION AFTER ERECTING THE ATTACHMENT....168
    3.8 CAUTIONS FOR HANDLING THE LOAD SAFETY DEVICE....169
    3.9 ERROR MESSAGES AND CORRECTIONS....170
    3.10 TABLE OF ERROR MESSAGES AND ALARMS....171
    3.11 CONFIRMING PROPER FUNCTIONING OF LOAD SAFETY DEVICE....172
  4. ASSEMBLY OF THE MACHINE....173
    4.1 UNLOADING THE BASIC MACHINE FROM THE TRAILER....174
    4.2 LOADING THE MACHINE ON A TRAILER....174
  5. ASSEMBLY/DISASSEMBLY OF BASIC MACHINE....174
    5.1 EXTENDING/RETRACTING THE CRAWLERS....176
      5.1.1 EXTENDING THE CRAWLERS....176
      5.1.2 RETRACTING THE CRAWLER....178
    5.2 INSTALLING/REMOVING AXLE EXTENSION ADAPTERS....180
      5.2.1 INSTALLING AXLE EXTENSION ADAPTERS....180
      5.2.2 REMOVING AXLE EXTENSION ADAPTERS....181
    5.3 ERECTING/LOWERING THE GANTRY....182
      5.3.1 ERECTING THE GANTRY....182
      5.3.2 LOWERING THE GANTRY....184
    5.4 INSTALLATION, REMOVAL OF THE COUNTERWEIGHT....185
      5.4.1 INSTALLATION OF THE COUNTERWEIGHT....186
      5.4.2 REMOVAL OF THE COUNTERWEIGHT....190
      5.4.3 INSTALLING/REMOVING CARBODY WEIGHTS....191
    5.5 INSTALLATION, REMOVAL OF THE COUNTERWEIGHT....192
      5.5.1 SETTING OF LMI....192
      5.5.2 PREPARATIONS FOR OPERATION....196
      5.5.3 INSTALLATION PROCEDURES....201
      5.5.4 DISASSEMBLY PROCEDURES....207
      5.5.5 OPERATION OF CYLINDER WHEN SETTING LOW GANTRY POSITION....212
  6. ASSEMBLY/DISASSEMBLY OF CRANE ATTACHMENT....215
    6.1 ASSEMBLING THE ATTACHMENT....217
      6.1.1 ARRANGEMENT OF BOOM/JIB/GUY LINE....217
      6.1.2 INSTALLING THE BACKSTOPS....224
      6.1.3 INSTALLING THE BOOM BASE....225
      6.1.4 INSTALLING THE BACKSTOPS TO THE REVOLVING FRAME....226
      6.1.5 INSTALLING THE UPPER SPREADER....226
      6.1.6 REEVING THE WIRE ROPE INTO THE UPPER AND LOWER SPREADER....227
      6.1.7 INSTALLING THE BOOM TIP....229
      6.1.8 INSTALLATION OF THE BASIC GUY LINE....230
      6.1.9 MAIN HOIST WIRE ROPE REEVING....231
      6.1.10 CONNECTING THE INSERT BOOMS....233
      6.1.11 INSTALLING THE CABLE ROLLERS....241
      6.1.12 CONNECTING THE BOOM GUY LINES....242
      6.1.13 CAUTION FOR CANTILEVER....244
      6.1.14 ASSEMBLING THE JIB....244
      6.1.15 REEVING OF REAR DRUM WIRE ROPE....248
      6.1.16 INSTALLING THE AUXILIARY SHEAVE....250
      6.1.17 REEVING THE REAR DRUM WIRE ROPE TO THE AUXILIARY SHEAVE....251
    6.2 ERECTING THE ATTACHMENT....252
      6.2.1 CONFIRMATION BEFORE ERECTING THE ATTACHMENT....252
      6.2.2 ERECTING THE ATTACHMENT....253
    6.3 LOWERING THE ATTACHMENT....255
      6.3.1 LOWERING THE ATTACHMENT....256
    6.4 DISASSEMBLING THE ATTACHMENT....257
      6.4.1 TREATMENT OF OVERHOIST LIMIT SWITCH WIRING....257
      6.4.2 WINDING UP THE FRONT DRUM/REAR DRUM WIRE ROPES....257
      6.4.3 DISASSEMBLING THE JIB....258
      6.4.4 REMOVING THE BOOM GUY LINE....259
      6.4.5 DISASSEMBLING THE BOOM....260
      6.4.6 REMOVING THE BOOM BASE....261
      6.4.7 REMOVAL OF THE COUNTERWEIGHT....262
      6.4.8 LOWERING THE GANTRY....262
    6.5 CAUTION WHEN TRANSPORTING BOOM....263
  7. WIRE ROPE....265
    7.1 HANDLING OF WIRE ROPE....265
      7.1.1 UNREELING METHOD OF WIRE ROPE....265
      7.1.2 WINDING WIRE ROPE ONTO THE DRUM....266
      7.1.3 INSTALLING THE ROPE SOCKET....267
      7.1.4 SPECIFICATION OF WIRE ROPE....267
      7.1.5 WIRE ROPE LENGTH....268
  8. MAINTENANCE....269
    8.1 CHECKS....274
      8.1.1 CHECKS OF THE UPPER....274
        8.1.1.1 CHECK OF UPPER DAILY OR EVERY 8HOURS....276
        8.1.1.2 CHECK OF UPPER MONTHLY OR EVERY 100 HOURS....281
        8.1.1.3 CHECK OF UPPER SEMI-ANNUALLY OR EVERY 600 HOURS....285
        8.1.1.4 CHECK OF UPPER WEEKLY OR EVERY 50 HOURS....286
      8.1.2 CHECK OF LOWER....288
        8.1.2.1 CHECK OF LOWER DAILY OR EVERY 8 HOURS....290
        8.1.2.2 CHECK OF LOWER MONTHLY OR EVERY 100 HOURS....291
        8.1.2.3 CHECK OF LOWER QUARTERLY OR EVERY 250 HOURS....293
        8.1.2.4 CHECK OF LOWER SEMI-ANNUALLY OR EVERY 600 HOURS....294
      8.1.3 CHECK OF ATTACHMENT....296
        8.1.3.1 CHECK OF ATTACHMENT DAILY OR EVERY 8 HOURS....298
    8.2 OIL/GREASE SUPPLY AND WATER SERVICE....304
      8.2.1 UPPER LUBRICATION (INCL. WATER SUPPLY)....308
      8.2.2 LOWER LUBRICATION....310
      8.2.3 ATTACHMENT LUBRICATION....312
      8.2.4 GREASE....314
      8.2.5 ENGINE OIL....317
      8.2.6 FUEL....318
      8.2.7 COOLANT....319
      8.2.8 HYDRAULIC OIL....321
      8.2.9 GEAR OIL....323
    8.3 CLEANING/WASHING/CHANGE OF FILTER ELEMENT AND STRAINER....328
    8.4 CHECK OF BATTERY....338
    8.5 ARRANGEMENT AND USE OF FUSE....341
    8.6 OPERATION UNDER UNUSUAL CONDITIONS....343
    8.7 MACHINE STORAGE....345
    8.8 TIGHTENING TORQUE VALUES....346
    8.9 SECURITY PARTS TO BE REPLACED PERIODICALLY....348
    8.10 ADJUSTMENT....349
      8.10.1 ADJUSTMENT OF FRONT AND REAR DRUM LOCKS....349
      8.10.2 ADJUSTMENT OF BOOM DRUM LOCK....350
      8.10.3 ADJUSTMENT OF THIRD DRUM LOCK....351
      8.10.4 ADJUSTMENT OF CRAWLER SHOES....352
    8.11 CONSUMABLE PARTS LIST....353
  9. REFERENCE MATERIALS....359
    9.1 SPECIFICATION....359
      9.1.1 PERFORMANCE....359
      9.1.2 OUTSIDE DIMENSIONS....359
    9.2 DIMENSIONS AND WEIGHT OF EACH PARTS....361
      9.2.1 BASE MACHINE....361
      9.2.2 COUNTERWEIGHT....362
      9.2.3 ATTACHMENT....363
    9.3 STABILITY IN SWINGING AND TRAVELING....365
    9.4 SYSTEM SCHEMATIC....367
      9.4.1 HYDRAULIC SYSTEM SCHEMATIC....367
      9.4.2 ELECTRICAL WIRING SCHEMATIC....368
S2GH15001ZE03 - KOBELCO CK1000-II LUFFING Crawler Crane OPERATION & MAINTENANCE MANUAL....385
  COVER....385
  TABLE OF CONTENTS....387
  IMPORTANT INFORMATION....391
  1. SAFE OPERATING PRACTICES FOR MOBILE CRANES....401
  2. OPERATION....421
    2.1 TERMINOLOGY OF MACHINE EACH PART....421
    2.2 LOCATIONS AND TERMS OF OPERATING CONTROLS....422
      2.2.1 OPERATING SWITCHES....424
    2.3 LUFFING JIB OPERATION....425
      2.3.1 LUFFING BOOM RAISING/LOWERING OPERATION....426
      2.3.2 JIB RAISING/LOWERING OPERATION....427
      2.3.3 HOOK RAISING/LOWERING OPERATION....429
    2.4 FREE FALL OPERATION....432
  3. LOAD SAFETY DEVICE....435
    3.1 LOCATION OF DEVICES....435
    3.2 TYPE AND FUNCTIONS OF DEVICES....438
    3.3 CONNECTING PROCEDURE OF WIRING....445
      3.3.1 LUFFING ATTACHMENT....445
    3.4 FUNCTION OF CONTROLLER/MONITOR....451
    3.5 OPERATING PROCEDURE OF CONTROLLER....455
      3.5.1 SETTING SCREEN....456
      3.5.2 SETTING OF THE CRANE CONFIGURATION....460
      3.5.3 SELECTION OF MAIN/JIB/AUX. LIFTING....465
      3.5.4 SETTING OF WORKING AREA LIMIT VALUE....466
      3.5.5 SETTING OF THE TIME....469
    3.6 WARNING ALARM AND AUTOMATIC STOP....471
      3.6.1 ITEMS OF WARNING ALARM AND AUTOMATIC STOP....471
      3.6.2 CONTENTS OF AUTOMATIC STOP....472
      3.6.3 RELEASE OF AUTOMATIC STOP....474
    3.7 INSPECTION....480
      3.7.1 INSPECTION BEFORE RAISING THE BOOM AFTER ASSEMBLY OF ATTACHMENT IS COMPLETED....480
      3.7.2 INSPECTION AFTER ERECTING THE ATTACHMENT....484
    3.8 CAUTION FOR HANDLING THE LOAD SAFETY DEVICE....485
    3.9 INDICATION OF ERRORS AND REMEDY....486
    3.10 INDICATION OF MESSAGE AND ALARM....487
    3.11 CONFIRMATION OF FUNCTION FOR LOAD SAFETY DEVICE....489
  4. ASSEMBLY/DISASSEMBLY OF CRANE ATTACHMENT WITH LUFFING JIB....491
    4.1 ASSEMBLY OF LUFFING ATTACHMENT....493
      4.1.1 ARRANGEMENT OF BOOM/ JIB/ GUY LINE....493
      4.1.2 REMOVING CRANE BOOM AND GUY LINE....501
      4.1.3 INSTALLING LUFFING BOOM BASE....501
      4.1.4 INSTALLING THE BACKSTOPS TO THE REVOLVING FRAME....502
      4.1.5 INSTALLING SPECIAL INSERT BOOM (WITH IDLER SHEAVE)....502
      4.1.6 CAUTION FOR CANTILEVER....503
      4.1.7 CONNECTING LUFFING BOOM TIP ASSEMBLY....504
      4.1.8 INSTALLING JIB ATTACHMENT....506
      4.1.9 ASSEMBLY OF JIB....506
      4.1.10 INSTALLING STRUT GUY LINE....507
      4.1.11 INSTALLING JIB HOIST WIRE ROPE....508
      4.1.12 CONNECTING STRUT GUY LINE AND STRUT BACKSTOP....509
      4.1.13 INSTALLING JIB GUY LINE....513
      4.1.14 REEVING OF FRONT AND REAR DRUM WIRE ROPES....514
      4.1.15 CONNECTING SAFETY DEVICE....517
    4.2 ERECTING THE LUFFING ATTACHMENT....520
      4.2.1 CONFIRMATION BEFORE ERECTING THE LUFFING ATTACHMENT....520
      4.2.2 ERECTING LUFFING ATTACHMENT....521
      4.2.3 CHECK BEFORE STARTING THE WORK....524
    4.3 LOWERING THE ATTACHMENT....525
      4.3.1 LOWERING THE ATTACHMENT....525
    4.4 DISASSEMBLY OF LUFFING ATTACHMENT....529
      4.4.1 DISCONNECTION OF WIRING FOR SAFETY DEVICE....530
      4.4.2 WINDING UP THE FRONT DRUM/REAR DRUM WIRE ROPES....530
      4.4.3 DISASSEMBLY OF JIB....531
      4.4.4 DISASSEMBLY OF LUFFING BOOM TIP ASSEMBLY....534
      4.4.5 DISASSEMBLING INSERT BOOM....536
      4.4.6 REMOVING BASE BOOM....536
    4.5 CAUTION WHEN TRANS-PORTING LUFFING BOOM TIP ASSEMBLY....537
  5. WIRE ROPE....539
    5.1 SPECIFICATION OF WIRE ROPE....539
    5.2 WIRE ROPE LENGTH....539
  6. MAINTENANCE....543
    6.1 CHECKS....548
      6.1.1 CHECKS OF THE UPPER....548
    6.2 OIL/GREASE SUPPLY....554
      6.2.1 ATTACHMENT....554
      6.2.2 GREASE....556
      6.2.3 HYDRAULIC OIL....557
  7. REFERENCE MATERIALS....559
    7.1 SPECIFICATION....559
      7.1.1 PERFORMANCE....559
    7.2 DIMENSIONS AND WEIGHT OF EACH PARTS....561
      7.2.1 ATTACHMENT....561
    7.3 SYSTEM SCHEMATIC....564
      7.3.1 ELECTRICAL WIRING SCHEMATIC....564
S3GH10012ZO04 - KOBELCO CK1000-II Crawler Crane Parts Manual....581
  COVER....581
  CONTROL SYSTEM....0
    CONTROL ASSY....598
    CONTROL LEVER ASSY (BOOM / MAIN / AUX.)....602
    CONTROL LEVER ASSY (SWING)(CRAWLER)....606
    CONTROL LEVER ASSY (CRAWLER)....610
    CONTROL LEVER ASSY (PROPEL)(PROPEL)....612
    REMOTE CONTROL VALVE INSTAL (BOOM / FRONT / REAR)....614
    SWING LOCK ASSY....616
    BRAKE PEDAL ASSY....618
    GRIP ASSY....622
    FLOOR PLATE ASSY....624
    GRIP ASSY (BOOM)....626
    PANEL ASSY....628
    PANEL ASSY....630
    PANEL ASSY (LEFT STAND)....632
    PANEL ASSY (LEFT SIDE)....634
    PANEL ASSY (BYPASS SWITCH)....635
    LAMP & SWITCH ASSY (WITH FREE FALL)....636
    DRUM LOCK ASSY (FRONT / REAR)....638
    DRUM LOCK ASSY (BOOM)....640
    LUB.LINES (FRONT / REAR)....642
    LUB.LINES (BOOM)....644
    MONITOR INSTAL....645
  WINCH SYSTEM....0
    WINCH INSTAL (φ26)(WITH FREE FALL / FRONT)(WITH FREE FALL / REAR)....646
    WINCH ASSY (φ26)(FRONT)(REAR)....650
    WINCH ASSY (φ26)(FRONT)....652
    WINCH ASSY (φ26)(REAR)....654
    REDUCTION UNIT ASSY (φ26)....656
  BOOM HOIST SYSTEM....0
    WINCH INSTAL ASSY (BOOM (φ16))....658
    WINCH ASSY....660
  SWING SYSTEM....0
    SWING MOTOR ASSY....662
    SWING MOTOR ASSY....664
    SWING REDUCTION ASSY....666
    SWING BEARING ASSY....670
    SWING BEARING LUB. LINES    ....672
  LINES....0
    PUMP HYD. LINES (CONTROL)....676
    PUMP HYD. LINES (DELIVERY)....678
    RIGHT DECK HYD. LINES....680
    MAIN VALVE HYD. LINES....688
    GANTRY CYLINDER HYD. LINE....692
    SWING CONTROL HYD. LINES    ....696
    ACCUMLATOR HYD. LINES....700
    FLOOR CONTROL HYD. LINES....702
    FLOOR CONTROL HYD. LINES....706
    CONNECTOR ASSY (GANTRY VALVE)....708
    BRAKE CONTROL HYD. LINES....710
    4-SECTION VALVE INSTAL....712
    3-SECTION VALVE HYD. LINES....714
    RETURN HYD. LINES....716
    DRAIN LINES....718
    RETURN BLOCK HYD. LINES....722
    CONTROL LINES....724
    2-SECTION VALVE INSTAL....726
    2-SECTION VALVE INSTAL (FUNCTION CUT/SWING PARKING BRAKE)....728
    4-SECTION VALVE HYD. LINES....730
    5-SECTION VALVE HYD. LINES....734
    8-SECTION VALVE HYD. LINES....738
    WINCH HYD. LINES (FOR FRONT & REAR DRUM)....740
    WINCH HYD. LINES (FOR FRONT & REAR DRUM)....742
    WINCH HYD. LINES (FOR BOOM DRUM)....744
    VALVE INSTAL....746
    OIL COOLER HYD. LINES....750
    CLAMP ASSY....752
    LOWER HYD. LINES....754
    SWIVEL JOINT INSTAL....758
    SWIVEL JOINT....762
    HYD. OIL TANK ASSY (FOR STANDARD)(FOR FREE FALL)(TANK)....764
    HYD. OIL COOLING LINES....768
    CONNECTOR ASSY....772
    CONNECTOR ASSY....774
  POWER PLANT....0
    POWER PLANT ASSY....776
    PUMP ASSY....782
    POWER DIVIDER....784
    MUFFLER INSTAL....786
    FUEL LINES....788
    RADIATOR INSTAL....792
    AIR CLEANER INSTAL....794
    FUEL TANK ASSY....796
  ELECTRIC SYSTEM....0
    ELEC ASSY (R.H. DECK)....800
    ELEC ASSY (REV. FRAME)....806
    ELEC ASSY (FLOOR PLATE)....810
    RELAY BOX ASSY....814
    ELEC ASSY (L.H. GUARD)....816
    ELEC ASSY (CAB)....818
    ELEC ASSY (L.H. DECK)....822
    WASHER TANK ASSY....828
    BATTERY INSTAL....830
    JUNCTION BOX ASSY....832
    RELAY ASSY....834
  CAB....0
    CAB INSTAL....836
    CAB ASSY....840
    DOOR ASSY....848
    RUBBER SHEET INSTAL (OPERATOR’S ROOM)....854
    LOCK ASSY....856
    SUN VISOR ASSY....858
    ROLL BLIND....860
    SASH ASSY....862
  GUARD / COVER / PLATFORM....0
    R.H. GUARD INSTAL....864
    R.H. GUARD ASSY....866
    L.H. GUARD INSTAL....870
    L.H. GUARD ASSY....874
    L.H. GUARD ASSY....878
    INSULATION ASSY....880
    INSULATION ASSY (L.H. GUARD)....884
    DRUM COVER....886
    SWING BEARING COVER....888
    UNDER COVER ASSY....890
    R.H. DECK ASSY....892
    R.H. DECK INSTAL (UNDER OF CAB)....896
    STEP ASSY....898
    L.H. DECK INSTAL....900
    GUARD ASSY (FRONT)....904
    BOOM DRUM COVER ASSY....906
    COVER ASSY (SWING FRAME)(SWING FRAME)....908
  LOWER SYSTEM....0
    PROPEL MOTOR ASSY....910
    REDUCTION UNIT ASSY....912
    IDLER ASSY....914
    IDLER ADJUST ASSY....916
    ROLLER ASSY....918
    LOWER ROLLER ASSY....919
    UPPER ROLLER ASSY....920
    FRAME COVER ASSY....922
    LINK ASSY....924
    CYLINDER ASSY....926
    STEP ASSY....930
    AXLE ADAPTER ASSY....932
    CRAWLER FRAME....934
    LOWER FRAME....935
    SHOE ASSY....936
  CRANE ATTACHMENT....0
    LOWER BOOM ASSY....938
    UPP. BOOM ASSY....940
    INSERT BOOM....942
    BOOM GUY CABLE....944
    BOOM POINT SHEAVE ASSY....946
    IDLER SHEAVE ASSY....948
    SPREADER GUIDE ASSY....950
    CABLE ROLLER ASSY (FOR UPP.BOOM)....952
    CABLE ROLLER (FOR INSERT BOOM)....954
    UPPER SPREADER ASSY....956
    LOWER SPREADER ASSY....958
    BACKSTOP ASSY....960
    BOOM BACKSTOP ASSY....962
    JIB ASSY....964
    STRUT ASSY....966
    INSERT JIB....968
    JIB GUY CABLE (FOR BASE BOOM SIDE)(FOR JIB SIDE)....970
    JIB GUY CABLE....972
    JIB POINT SHEAVE ASSY....974
    AUX. SHEAVE ASSY....976
    CABLE ROLLER ASSY (FOR INSERT JIB)....978
    ANGLE METER INSTAL....980
    WIRE ROPE ASSY (MAIN)(AUXLIARY)(THIRD)....982
    WIRE ROPE ASSY (BOOM)....984
  LUFFING ATTACHMENT....0
    LUFFING JIB ASSY....986
    REAR STRUT ASSY....988
    FRONT STRUT ASSY....990
    LOW. BOOM ASSY (FOR LUFFING)....992
    UPP BOOM ASSY....994
    BOOM POINT SHEAVE ASSY....996
    IDLER SHEAVE ASSY....998
    STRUT SHEAVE ASSY (FRONT STRUT)....1000
    STRUT SHEAVE ASSY (REAR STRUT)....1002
    SPECIAL INSERT BOOM....1004
    INSERT BOOM....1006
    IDLER SHEAVE ASSY....1008
    LOWER JIB ASSY....1010
    BACKSTOP ASSY, BOOM....1012
    BOOM BACKSTOP ASSY....1014
    JIB BACKSTOP ASSY....1016
    JIB BACKSTOP ASSY....1018
    JIB BACKSTOP ASSY....1020
    HYD. OIL TANK INSTAL....1022
    HYD. OIL TANK ASSY....1024
    AUX. SHEAVE ASSY....1026
    ANGLE METER ASSY....1028
    TRAVELING KIT....1030
    ROLLER ASSY....1032
    SWITCH PANEL ASSY....1034
    JIB ELEC ASSY....1036
    LABEL (LUFFING BOOM / JIB / GUYLINE ARRANGEMENT)....1040
    LABEL ASSY....1042
    HOOK OVERHOIST LIMIT SWITCH (FOR LUFFING)....1044
    LIMIT SWITCH ASSY....1046
    WINCH ASSY, THIRD....1048
  GANTRY....0
    GANTRY ASSY....1050
    SUB GANTRY ASSY....1054
    GANTRY LUB. LINES....1058
  TAGLINE ....0
    TAGLINE HYD. LINES....1060
    TAGLINE ASSY....1064
    TAGLINE GUIDE ASSY....1066
    GUIDE SHEAVE ASSY....1068
   THIRD....0
    CONTROL ASSY....1070
    CONTROL ASSY....1072
    BRAKE PEDAL ASSY....1074
    DRUM LOCK ASSY....1076
    DRUM LOCK LUB. LINES....1078
    TRIMMER INSTAL....1080
    WINCH INSTAL....1082
    WINCH ASSY....1084
    WINCH ASSY....1086
    HYD. LINES ASSY....1088
    WINCH HYD. LINES....1092
    HYD. LINES ASSY....1096
    4-SECTION VALVE HYD. LINES (MOTOR BRAKE)....1098
    8-SECTION VALVE HYD LINES....1100
    HYD. LINES ASSY....1102
    CONNECTOR ASSY....1104
    HYD. LINES ASSY....1106
    HYD. LINES WINCH    ....1108
    CLUTCH VALVE INSTAL....1110
    GANTRY SHEAVE ASSY....1112
    IDLER SHEAVE ASSY....1116
    DRUM COVER ASSY....1118
    HARNESS ASSY....1122
  SAFETY DEVICE....0
    SAFETY DEVICE HARNESS (FOR GANTRY)....1124
    SAFETY DEVICE HARNESS (FOR BASE MACHINE)....1126
    SAFETY DEVICE HARNESS (BOOM ANGLE DETECTOR)....1128
    OVERHOIST PREVENTIVE DEVICE (FOR BOOM BASE & INSERT BOOM)(FOR BOOM TIP)....1130
    SAFETY DEVICE HARNESS (FOR JIB)....1134
    OVERHOIST LIMIT SWITCH (MAIN HOOK)....1136
    HOOK OVERHOIST LIMIT SWITCH (FOR AUX. SHEAVE & JIB)....1138
    LIMIT SWITCH ASSY....1140
    LIMIT SWITCH ASSY (BASE MACHINE SIDE)(BOOM SIDE)....1142
  COUNTERWEIGHT / FRAME....0
    COUNTERWEIGHT ASSY....1144
    SWING ALARM LAMP....1146
    REV. FRAME....1148
    RUBBER ASSY....1150
    CARBODY WEIGHT....1154
    C/W REMOVAL DEVICE....1156
    C/W REMOVAL HYD. LINES (C/W REMOVAL DEVICE)....1160
    C/W REMOVAL HYD. LINES (C/W REMOVAL DEVICE)....1162
    REMOTE CONTROL ASSY....1166
  LABEL....0
    LABEL (FOR BASE MACHINE)....1168
    LABEL ASSY (FOR BASE MACHINE)....1176
    LABEL ASSY (FOR ATTACHMENT)....1180
    LABEL ASSY (SWITCH PANEL)....1182
  OTHERS....0
    AIR CONDITIONER (INDOOR UNIT)....1184
    AIR CONDITIONER (OUTDOOR UNIT)....1190
    AIR CONDITIONER UNIT....1194
    UPPER FINAL....1198
    UPPER FINAL....1200
    UPPER FINAL (PEDAL COVER)....1202
    UPPER FINAL (ANTI-SLIP)....1204
    UPPER FINAL (ANTI-SLIP)....1206
    TOOL ASSY....1208
    SPARE PART KIT....1210
    SEAT ASSY....1212
    WIPER INSTAL (OPTION)....1214
    WASHER TANK INSTAL (OPTION)....1216
    CAMERA INSTAL (FOR DRUM / OPTION)....1218
    CAMERA INSTAL (FOR REAR / OPTION)....1222
    MONITOR INSTAL (OPTION)....1226
    HARNESS ASSY (FOR MONITOR / OPTION)....1230
    TELEVISION MONITOR (OPTION)....1232
    RADIO INSTAL (COVER)(RADIO OPTION)....1234
    FOOT ACCELERATOR (RIGHT)(RIGHT & LEFT / OPTION)(LEFT / OPTION)....1236
    ONE-WAY CALL ASSY (OPTION)....1240
    AUX. PLATFORM....1242
    AUX. PLATFORM (OPTION)....1246
    TRAVELING KIT (OPTION)....1250
    DRUM TURN SENSOR INSTAL....1252
    DRUM TURN SWITCH INSTAL....1254
    DRUM TURN SENSOR GRIP INSTAL....1255
    GRIP ASSY....1256
    FAN ASSY (OPTION)....1258
    MIRROR INSTAL (OPTION)....1260
    PLATE ASSY....1262
    SHEAVE ASSY (FOR CRAWLER REMOVAL / OPTION)....1264
    HEAD GUARD (OPTION)....1266
    EXTINGUISHER INSTAL (OPTION)....1268
    HANDRAIL INSTAL (L.H. GUARD)....1270
    GUARD INSTAL (CAB LEFT WINDOW)....1272
    LEVEL GAUGE INSTAL (OPTION)....1274
    LIFE HAMMER INSTAL (OPTION)....1276
  INDEX OF PART NO.....1279
S5GH00002ZE04 -  KOBELCO CK1000-II, CKE900 Crawler Crane OPERATION & MAINTENANCE MANUAL....1299
  COVER....1299
  TABLE OF CONTENTS....1301
  SAFETY....1309
  1. SPECIFICATION....1321
    1.1 CK1000-II SPECIFICATION....1323
      1.1.1 PERFORMANCE....1323
      1.1.2 OUTSIDE DIMENSIONS....1323
      1.1.3 DIMENSIONS AND WEIGHT OF EACH PARTS....1325
      1.1.4 STABILITY IN SWINGING AND TRAVELING....1331
    1.2 CKE900 SPECIFICATION....1333
      1.2.1 PERFORMANCE....1333
      1.2.2 OUTSIDE DIMENSIONS....1333
      1.2.3 DIMENSIONS AND WEIGHT OF EACH PARTS....1335
      1.2.4 STABILITY IN SWINGING AND TRAVELING....1341
  2. MAINTENANCE STANDARDSTEST PROCEDURES....1343
    2.1 MAINTENANCE STANDARD....1346
      2.1.1 PIN, BUSHING, SPRING, LINING AND SHEAVE....1346
      2.1.2 PROPEL DEVICE....1353
    2.2 PERFORMANCE STANDARD AND TEST PROCEDURE....1359
      2.2.1 OPERATING SPEED....1359
      2.2.2 POINT AND METHOD OF MEASURING PRESSURE....1360
  3. GENERAL WORK STANDARD....1365
    3.1 TIGHTENING TORQUE OF CAPSCREWS AND NUTS....1367
      3.1.1 METRIC COARSE THREADS....1367
      3.1.2 METRIC FINE THREADS....1367
      3.1.3 COARSE THREDS UNC....1368
      3.1.4 FINE THREADS UNF....1368
      3.1.5 TIGHTENING TORQUE OF HYDRAULIC FITTINGS....1369
    3.2 STANDARD PARTS....1371
      3.2.1 BOLT....1371
      3.2.2 O-RING....1372
      3.2.3 BACK-UP RING....1373
      3.2.4 BITE FITTING....1374
    3.3 CONVERSION TABLE....1376
      3.3.1 UNIT CONVERSION....1376
      3.3.2 MILLIMETER : INCH CONVERSION TABLE....1377
      3.3.3 METER-FOOT CONVERSION TABLE....1379
      3.3.4 GRADIENT CONVERSION TABLE....1380
    3.4 TABLE OF UNIT WEIGHT....1381
  4. POWER TRAIN....1383
    4.1 INTRODUCTION....1385
    4.2 ENGINE....1387
      4.2.1 INTRODUCTION....1387
      4.2.2 REMOVAL....1387
      4.2.3 REPAIR AND MAINTENANCE....1388
      4.2.4 RE-INSTALLATION....1389
    4.3 PUMP DRIVE ASSEMBLY....1392
      4.3.1 INTRODUCTION....1392
      4.3.2 REMOVAL....1392
      4.3.3 DISASSEMBLING THE POWER DIVIDER....1394
      4.3.4 CHECK AND REPAIR OF THE POWER DIVIDER....1395
      4.3.5 ASSEMBLING THE POWER DIVIDER....1396
      4.3.6 RE-INSTALLATION....1397
  5. HYDRAULIC SYSTEM....1403
    5.1 LOCATION OF MAIN HYDRAULIC COMPONENTS....1405
    5.2 HYDRAULIC CIRCUITS AND COMPONENTS....1406
      5.2.1 HYDRAULIC CIRCUIT....1406
      5.2.2 COMPONENT SPECIFICATIONS....1409
      5.2.3 LOCATION OF HYDRAULIC COMPONENTS....1412
    5.3 HYDRAULIC SYSTEM....1418
      5.3.1 PREFACE....1418
      5.3.2 OUTLINE....1418
      5.3.3 OIL FLOW FROM NO.1 AND NO. 2 PUMPS....1420
      5.3.4 OIL FLOW FROM No.3 PUMP....1422
      5.3.5 OIL FLOW FROM NO.4 AND NO. 5 PUMPS(FOR MAIN AND AUX. WINCH DRUMS BRAKE COOLING CIRCUIT)....1423
      5.3.6 OIL FLOW FROM NO.6 PUMP (CONTROL PUMP)....1425
      5.3.7 OIL FLOW FROM No.7 PUMP (FOR AUXILIARY ACTUATOR CIRCUIT)....1428
    5.4 VALVES....1429
  6. HOIST SYSTEM....1439
    6.1 APPARATUS AND LOCATION OF COMPONENTS....1441
    6.2 CONSTRUCTION AND FUNCTION....1442
      6.2.1 HYDRAULIC SCHEMATIC....1442
      6.2.2 LIFTING A LOAD....1444
      6.2.3 HOLDING A RAISED LOAD....1446
      6.2.4 LOWERING A LOAD(POWERED LOWERING)....1448
      6.2.5 FREEFALL OPERATION....1450
      6.2.6 FREE FALL ACCELERATION....1454
    6.3 DRUM AND REDUCTION UNIT....1456
      6.3.1 DRUM....1456
      6.3.2 REDUCTION UNIT....1458
    6.4 ADJUSTMENT OF DRUM LOCK....1460
    6.5 BRAKE PEDAL....1462
      6.5.1 ASSEMBLY DRAWING....1462
      6.5.2 ADJUSTING THE BRAKE PEDAL....1464
    6.6 BLEEDING AIR FROM BRAKE CIRCUIT....1465
  7. BOOM HOIST SYSTEM....1467
    7.1 APPARATUS AND LOCATION OF COMPONENTS....1469
    7.2 CONSTRUCTION AND FUNCTION....1470
      7.2.1 HYDRAULIC SCHEMATIC....1470
      7.2.2 RAISING THE BOOM....1472
      7.2.3 NEUTRAL(MAINTAINING THE BOOM POSITION)....1474
      7.2.4 LOWERING THE BOOM....1476
    7.3 BOOM DRUM LOCK....1478
      7.3.1 ASSEMBLY DRAWING....1478
      7.3.2 ADJUSTING THE BOOM DRUM LOCK....1479
    7.4 REDUCTION UNIT....1480
  8. SWING SYSTEM....1483
    8.1 APPARATUS AND LOCATION OF COMPONENTS....1485
    8.2 CONSTRUCTION AND FUNCTION....1486
      8.2.1 HYDRAULIC SCHEMATIC....1486
      8.2.2 SWING....1488
      8.2.3 STOPPING....1490
    8.3 SWING REDUCTION UNIT....1492
    8.4 SWING BEARING....1496
    8.5 SWING LOCK....1498
  9. PROPEL SYSTEM....1499
    9.1 LOCATION OF THE MAJOR COMPONENTS....1501
    9.2 CONSTRUCTION AND FUNCTION....1502
      9.2.1 HYDRAULIC SCHEMATIC....1502
      9.2.2 PROPELLING (RIGHT SIDE FORWARD)....1504
      9.2.3 STOPPING....1506
    9.3 PROPEL REDUCTION UNIT....1508
      9.3.1 REDUCTION UNIT....1510
      9.3.2 MOTOR....1512
    9.4 ADJUSTMENT....1514
    9.5 UPPER AND LOWER ROLLER AND AXLE ADAPTER TIGHTENING TORQUE....1515
  10. ELECTRIC SYSTEM....1517
    10.1 ELECTRICAL WIRING SCHEMATIC....1519
    10.2 CONNECTOR LIST....1534
    10.3 ARRANGEMENT OF ELECTRICAL PART....1586
      10.3.1 ELECTRICAL PART OF CAB....1586
      10.3.2 ELECTRICAL PART OF RIGHT DECK....1590
      10.3.3 ELECTRICAL PART OF FLOOR PLATE & LEFT SIDE STAND PANEL....1598
      10.3.4 ELECTRICAL PART OF REVOLVING FRAME....1603
      10.3.5 ELECTRICAL PART OF LEFT DECK....1604
      10.3.6 ELECTRICAL PART OF LEFT GUARD....1611
      10.3.7 HARNESS PART NUMBER LIST (ALL MODELS)....1612
    10.4 ELECTRICAL PART....1614
      10.4.1 LOCATION AND USE OF FUSE....1614
      10.4.2 FUSE BOX (GG73E00004F1)....1616
      10.4.3 WIPER CONTROL RELAY (2479R1366)....1618
      10.4.4 SWING FLASHER UNIT (2480U306)....1619
      10.4.5 PRESSURE SWITCH (CONTROL PRESSURE CUT & FREE FALL)....1620
      10.4.6 PRESSURE SENSOR....1621
      10.4.7 RELAY BOX (GG24E00024F1)....1623
      10.4.8 LEFT SIDE STAND PANEL....1628
    10.5 TROUBLESHOOTING OF EXHAUST GAS THIRD REGULATION ENGINE....1632
      10.5.1 FAILURE DIAGNOSIS FUNCTION....1632
      10.5.2 HOW TO CHECK THE FAILURE CONTENTS....1633
      10.5.3 CHECKING OF DIAGNOSIS LAMP FUNCTION....1638
      10.5.4 ENGINE ECU....1639
  11. LOAD SAFETY DEVICE....1643
    11.1 PART NAMES AND FUNCTIONS....1645
      11.1.1 FRONT VIEW....1645
      11.1.2 CONFIGURATION OF SCREENS....1650
      11.1.3 DATA TRANSMISSION BETWEEN CONTROLLER AND CARDS....1655
      11.1.4 DETAILS OF INDICATORS ON MAIN DISPLAY SCREEN....1657
      11.1.5 REAR VIEW....1661
      11.1.6 ITEMS REQUIRED TO BE EXECUTED FOR REPLACEMENT OF CONTROLLER OR DATA CARDAND INSTRUCTIONS(IN A SIMILAR MANNER TO UPGRADE OF PROGRAM)....1666
    11.2 PREPARATION FOR USE....1667
    11.3 TURN THE POWER ON....1668
    11.4 UPGRADING PROGRAMS....1669
      11.4.1 PROCEDURES....1669
      11.4.2 UPGRADING OF INDICATION PROGRAMS....1671
      11.4.3 UPGRADING OF CONTROL PROGRAMS....1674
    11.5 STATUS CHECK....1676
      11.5.1 SIGNAL CHECK....1677
      11.5.2 OPERATION PROGRESS....1679
      11.5.3 COMMUNICATION DATA....1682
      11.5.4 INDICATION OF ADJUSTMENT VALUE....1683
      11.5.5 TROUBLE RECORD....1692
      11.5.6 CHOICE OF LANGUAGE (CKE SERIES ONLY)....1694
      11.5.7 LOAD RECORD (LOAD RECORD IN THE MAIN MENU)....1695
    11.6 ADJUSTMENTS....1696
      11.6.1 REMOVING THE INNER PANEL....1696
      11.6.2 ADJUSTMENT....1697
      11.6.3 LOAD ADJUSTMENT....1718
      11.6.4 ADJUSTMENT DATA COPY (INITIALIZATION)....1720
      11.6.5 VERSION CHECK....1726
    11.7 ERROR CODE (ABNORMALITY DETECTION) AND COUNTERMEASURES....1727
    11.8 CONTROL OUTPUT....1731
    11.9 RELEASES....1743
      11.9.1 RELEASE FUNCTION....1743
    11.10 MECHANICAL SPECIFICATION....1751
      11.10.1 ENVIRONMENTAL PERFORMANCE PARAMETERS....1751
      11.10.2 LOAD CELL (CRANE)....1752
      11.10.3 ANGLE SENSOR....1753
      11.10.4 CONTROLLER....1754
    11.11 EXTERNAL DIMENSIONS....1758
    11.12 ELECTRIC SCHEMATIC DIAGRAM....1759
      11.12.1 CRANE TYPE....1759
      11.12.2 LUFFING TYPE....1760
    11.13 CONTROLLER MALFUNCTION EMERGENCY MEASURES....1761
    11.14 LOAD SAFETY DEVICE CHECK PROCEDURES....1762
  12. GAUGE CLUSTER....1763
    12.1 CONFIGURATION OF DISPLAY....1765
    12.2 PRIORITY....1766
    12.3 STATUS DISPLAY....1768
    12.4 FAULT LOG DISPLAY....1777
  13. TOTAL CONTROLLER....1783
    13.1 ARRANGEMENT OF TOTAL CONTROLLER....1785
    13.2 COMPOSITION OF SYSTEM....1786
      13.2.1 OUTPUT RELATION TO CONTROLLER....1787
    13.3 FUNCTION OF TOTAL CONTROLLER....1788
      13.3.1 FRONT, REAR AND THIRD DRUM....1792
    13.4 TOTAL CONTROLLER (HARDWARE)....1813
      13.4.1 OUTLINE....1813
      13.4.2 SPECIFICATIONS OF TOTAL CONTROLLER OUTPUT....1814
      13.4.3 DETAILS OF TOTAL CONTROLLER CONNECTOR....1818
      13.4.4 ARRANGEMENT OF TOTAL CONTROLLER CONNECTOR PIN....1819
      13.4.5 PROPORTIONAL SOLENOID VALVE MEASURING POSITION (VOLTAGE)....1826
    13.5 ADJUSTMENT OF TOTAL CONTROLLER....1828
      13.5.1 NECESSITY OF ADJUSTMENT....1828
      13.5.2 ADJUSTMENT PROCEDURES OF TOTAL CONTROLLER....1828
    13.6 CONTROLLER MALFUNCTION EMERGENCY MEASURES....1835
  14. AIR CONDITIONER....1837
    14.1 OPERATION ITEMS....1838
    14.2 SAFETY MONITOR FUNCTIONS....1839
    14.3 DISASSEMBLY AND ASSEMBLY PROCEDURE....1842
      14.3.1 SPECIAL CONSIDERATIONS DURING REPLACEMENT....1842
      14.3.2 INTERIOR UNIT....1844
    14.4 OPERATIONAL PRECAUTIONS....1853
    14.5 INSPECTION AND MAINTENANCE....1854
      14.5.1 INSPECTION/MAINTENANCE LIST....1854
      14.5.2 INSPECTION/MAINTENANCE PROCEDURES....1854
    14.6 ELECTRIC SYSTEM SCHEMATIC....1858

KOBELCO CK1000-II, CKE900 Crawler Cranes OPERATION & MAINTENANCE Manual

Logo