Komatsu Skid Steer Loader SK1020-5, SK1020-5 turbo Repair Service Manual

Make: 
Model: 
Price: US$ 59.00

Complete service repair manual with Electrical Wiring Diagrams for Komatsu Skid Steer Loader SK1020-5, SK1020-5 turbo, with all the technical information to maintain, diagnose, repair, rebuild like professional mechanics.

Komatsu Skid Steer Loader SK1020-5, SK1020-5 turbo workshop service repair manual includes:
* Numbered table of contents easy to use so that you can find the information you need fast.
* Detailed sub-steps expand on repair procedure information
* Numbered instructions guide you through every repair procedure step by step.
* Troubleshooting and electrical service procedures are combined with detailed wiring diagrams for ease of use.
* Notes, cautions and warnings throughout each chapter pinpoint critical information.
* Bold figure number help you quickly match illustrations with instructions.
* Detailed illustrations, drawings and photos guide you through every procedure.
* Enlarged inset helps you identify and examine parts in detail.

PRODUCT DETAILS:
Total Pages: 1,243 pages
File Format: PDF (Internal Links, Bookmarked, Table of Contents, Searchable, Printable, high quality)
Language: English

WEBM005300 - Skid Steer Loader SK1020-5, SK1020-5 turbo Shop Manual.pdf
WEBM006000 - Skid Steer Loader SK1026-5 turbo Shop Manual.pdf
WEAM004801 - Skid Steer Loader SK1020-5 Operation & Maintenance Manual.pdf
WEAM004803 - Skid Steer Loader SK1020-5 Operation & Maintenance Manual.pdf
WEAM005205 - Skid Steer Loader SK1020-5 turbo Operation & Maintenance Manual.pdf
WEAM005502 - Skid Steer Loader SK1020-5 turbo Operation & Maintenance Manual.pdf
WEAM006800 - Skid Steer Loader SK1026-5 turbo Operation & Maintenance Manual.pdf

MAIN SECTIONS
WEAM004801 - Skid Steer Loader SK1020-5 Operation & Maintenance Manual....2
  COVER....2
  1.1 FOREWORD....4
  1.2 INFORMATION ON SAFETY....6
  1.3 INTRODUCTION....8
    1.3.1 INTENDED USES....8
    1.3.2 IMPROPER OR UNAUTHORIZED USES....8
    1.3.3 MAIN CHARACTERISTICS....9
    1.3.4 RUNNING-IN....9
  1.4 PRODUCT IDENTIFICATION....10
    1.4.1 MACHINE SERIAL NUMBER....10
    1.4.2 MACHINE IDENTIFICATION PLATE....10
    1.4.3 ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE....11
    1.4.4 TRAVEL REDUCTION GEAR SERIAL NUMBER....11
    1.4.5 CAB SERIAL NUMBER....11
    1.4.6 EXCAVATOR IDENTIFICATION PLATE (if installed)....11
    1.4.7 SERIAL NUMBERS AND DISTRIBUTORS ADDRESS....12
  TABLE OF CONTENTS....13
  SAFETY AND ACCIDENT PREVENTION....20
    2.1 SAFETY, NOISE AND VIBRATION PLATES....21
      2.1.1 POSITION OF THE SAFETY PLATES....21
      2.1.2 POSITION OF THE PICTOGRAMS....39
      2.1.3 PICTOGRAMS AND RELEVANT MEANINGS....43
      2.1.4 VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED....47
    2.2 GENERAL PRECAUTIONS....48
      2.2.1 GENERAL SAFETY RULES....48
      2.2.2 SAFETY DEVICES AND GUARDS....48
      2.2.3 CLOTHING AND PERSONAL PROTECTION ITEMS....48
      2.2.4 UNAUTHORIZED MODIFICATIONS....49
      2.2.5 LEAVING THE OPERATORS SEAT....49
      2.2.6 GETTING ON AND OFF THE MACHINE....50
      2.2.7 CHECKING THE REAR-VIEW MIRRORS (if installed)....50
      2.2.8 PREVENTING FIRES DUE TO FUEL AND OIL....51
      2.2.9 PREVENTING BURNS....51
      2.2.10 PREVENTING DAMAGE DUE TO ASBESTOS POWDER....52
      2.2.11 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....52
      2.2.12 FIRE EXTINGUISHERS AND FIRST AID KIT....53
      2.2.13 PRECAUTIONS CONCERNING THE CAB STRUCTURE....53
      2.2.14 PRECAUTIONS CONCERNING THE EQUIPMENT....53
    2.3 PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE....54
      2.3.1 SAFETY ON THE WORK SITE....54
      2.3.2 FIRE PREVENTION....54
      2.3.3 PRECAUTIONS TO BE TAKEN FOR THE OPERATOR'S CAB....54
      2.3.4 ROOM VENTILATION....55
      2.3.5 PRECAUTIONS TO BE TAKEN FOR THE LIGHTS (if installed)....55
      2.3.6 CLEANING THE WINDOWS AND THE REAR-VIEW MIRRORS - CHECKING THE WINDSHIELD WIPER BLADES (if i.....55
    2.4 PRECAUTIONS TO BE TAKEN WHEN WORKING....56
      2.4.1 STARTING THE ENGINE....56
      2.4.2 RULES TO BE FOLLOWED WHEN TRAVELING ON ROADS (if required)....56
      2.4.3 CHECKS FOR TRAVELING IN REVERSE....57
      2.4.4 MOVING THE MACHINE....58
      2.4.5 WORKING ON SLOPES....58
      2.4.6 PREVENTING ELECTROCUTION....60
      2.4.7 VISIBILITY....61
      2.4.8 WORKING ON ICY OR SNOW-COVERED SURFACES....61
      2.4.9 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....61
      2.4.10 WORKING ON LOOSE GROUND....61
      2.4.11 PARKING THE MACHINE....62
    2.5 TRANSPORTING THE MACHINE ON OTHER VEHICLES....63
      2.5.1 LOADING AND UNLOADING THE MACHINE....63
      2.5.2 THE ROUTE....63
    2.6 BATTERY....64
      2.6.1 SAFETY PRECAUTIONS FOR WORK ON BATTERIES....64
      2.6.2 STARTING WITH BOOSTER CABLES....64
    2.7 PRECAUTIONS FOR EMERGENCY RECOVERY....65
    2.8 PRECAUTIONS TO BE TAKEN DURING MAINTENANCE....67
      2.8.1 WARNING PLATES....67
      2.8.2 TOOLS....67
      2.8.3 PERSONNEL....68
      2.8.4 EQUIPMENT....68
      2.8.5 WORKING UNDER THE MACHINE....68
      2.8.6 KEEPING THE MACHINE CLEAN....68
      2.8.7 USE OF THE ENGINE DURING MAINTENANCE....69
      2.8.8 PERIODICAL CHANGE OF THE PARTS THAT ARE CRITICAL FOR SAFETY....69
      2.8.9 STOP THE ENGINE BEFORE CARRYING OUT ANY MAINTENANCE OPERATION OR INSPECTION....69
      2.8.10 RULES FOR REFUELING AND ADDING OIL....70
      2.8.11 CHECKING THE COOLANT LEVEL IN THE RADIATOR....70
      2.8.12 USING LAMPS....70
      2.8.13 PRECAUTIONS CONCERNING THE BATTERY AND THE ALTERNATOR....71
      2.8.14 PRECAUTIONS CONCERNING THE STARTER....71
      2.8.15 PRECAUTIONS CONCERNING HIGH-PRESSURE HOSES....72
      2.8.16 PRECAUTIONS TO BE TAKEN WHEN WORKING ON HIGH-PRESSURE SYSTEMS....72
      2.8.17 PRECAUTIONS FOR MAINTENANCE WORK INVOLVING HIGH TEMPERATURES AND PRESSURES....72
      2.8.18 COOLING FAN AND FAN BELT....73
      2.8.19 WASTE MATERIALS....73
      2.8.20 PRECAUTIONS TO BE TAKEN WHEN INFLATING THE TIRES....73
      2.8.21 PRECAUTIONS TO BE TAKEN WHEN USING THE SYNTHETIC BIODEGRADABLE OIL TYPE HEES....74
  THE MACHINE AND ITS OPERATIONS....76
    3.1 SAFETY LOCKS....77
      3.1.1 LOADER LOCKS....77
      3.1.2 EXCAVATOR LOCKS (if installed)....79
      3.1.3 ASPHALT CUTTER LOCKS (if installed)....81
    3.2 GENERAL VIEWS....82
      3.2.1 FRONT GENERAL VIEW....82
      3.2.2 REAR GENERAL VIEW....83
      3.2.3 CAB INSIDE GENERAL VIEW....84
    3.3 INSTRUMENTS AND CONTROLS....86
      3.3.1 INSTRUMENTS....86
      3.3.2 WARNING LIGHTS....88
      3.3.3 SWITCHES AND PUSH BUTTONS....93
      3.3.4 ELECTRICAL ACCESSORIES....98
      3.3.5 MACHINE CONTROLS....100
    3.4 FUSES AND RELAYS....118
      3.4.1 MACHINE FUNCTION FUSES....118
      3.4.2 MAIN FUSE....119
      3.4.3 RELAYS....120
    3.5 GUARDS AND DRIVERS SEAT....122
      3.5.1 ENGINE HOOD....122
      3.5.2 REAR PANEL....123
      3.5.3 CAB....124
        3.5.3.1 RAISING THE CAB....125
      3.5.4 STANDARD SEAT....127
      3.5.5 SUSPENSION SEAT....127
      3.5.6 SAFETY BELT....128
      3.5.7 EMERGENCY EXIT....128
      3.5.8 TECHNICAL DOCUMENTATION CASE....129
      3.5.9 FIRE EXTINGUISHER....129
      3.5.10 FIRST AID KIT....129
    3.6 USE OF THE MACHINE....130
      3.6.1 CHECKS BEFORE STARTING THE ENGINE....130
        3.6.1.1 VISUAL CHECKS....130
        3.6.1.2 DAILY CHECKS....130
        3.6.1.3 OPERATIONAL CHECKS....131
      3.6.2 STARTING THE ENGINE....132
        3.6.2.1 STARTING WITH WARM ENGINE OR IN TEMPERATE CLIMATES....132
        3.6.2.2 STARTING WITH COLD ENGINE OR IN COLD CLIMATES....133
      3.6.3 WARMING THE ENGINE....134
      3.6.4 HEATING THE HYDRAULIC OIL....134
      3.6.5 HOW TO MOVE THE MACHINE (ISO PATTERN CONTROL SYSTEM)....134
        3.6.5.1 STEERING (CHANGING DIRECTION)....136
      3.6.6 HOW TO MOVE THE MACHINE (OPTIONAL PATTERN CONTROL SYSTEM)....138
        3.6.6.1 STEERING (CHANGING DIRECTION)....140
      3.6.7 MOVING ON SLOPES....142
      3.6.8 MAXIMUM IMMERSION DEPTH....143
    3.7 PARKING THE MACHINE....144
      3.7.1 PARKING ON LEVEL GROUND....144
      3.7.2 PARKING ON SLOPES....145
    3.8 STOPPING THE ENGINE....146
    3.9 TRANSPORTING THE MACHINE ON OTHER VEHICLES....147
      3.9.1 LOADING AND UNLOADING THE MACHINE....147
      3.9.2 TRANSPORT....148
    3.10 HOW TO LIFT THE MACHINE....149
    3.11 PRECAUTIONS TO BE TAKEN IN THE COLD SEASON....150
      3.11.1 FUEL AND LUBRICANTS....150
      3.11.2 COOLANT....150
      3.11.3 BATTERY....151
      3.11.4 OTHER PRECAUTIONS....151
      3.11.5 PRECAUTIONS TO BE TAKEN AT THE END OF WORK....151
    3.12 PRECAUTIONS TO BE TAKEN IN THE WARM SEASON....152
    3.13 USING THE WORK EQUIPMENT....153
      3.13.1 LOWERING THE EQUIPMENT IN CASE OF MACHINE FAILURE....153
      3.13.2 ORGANIZING THE WORK AREA....154
      3.13.3 LOADING MATERIAL FROM PILES AND ON LEVEL SURFACES....155
      3.13.4 LOADING MATERIAL ON SLOPES....156
      3.13.5 DIGGING METHOD....157
      3.13.6 CHANGING THE BUCKET WITH STANDARD RAPID COUPLING....158
        3.13.6.1 RELEASING THE BUCKET....159
        3.13.6.2 COUPLING THE BUCKET....159
        3.13.6.3 CHECKING THE POSITION OF THE LOCKING PINS....160
        3.13.6.4 ADJUSTING THE LOCKING PINS....161
    3.14 LONG PERIODS OF INACTIVITY....162
      3.14.1 BEFORE THE PERIOD OF INACTIVITY....162
      3.14.2 DURING THE PERIOD OF INACTIVITY....163
      3.14.3 AFTER THE PERIOD OF INACTIVITY....163
    3.15 TROUBLESHOOTING....164
      3.15.1 HOW TO REMOVE THE MACHINE....164
      3.15.2 IF THE FUEL HAS BEEN COMPLETELY DEPLETED....164
      3.15.3 IF THE BATTERY IS DEPLETED....165
        3.15.3.1 STARTING WITH BOOSTER CABLES....166
      3.15.4 OTHER TROUBLES....167
        3.15.4.1 ELECTRICAL CIRCUIT....167
        3.15.4.2 HYDRAULIC SYSTEM....168
        3.15.4.3 ENGINE....169
        3.15.4.4 HYDROSTATIC TRANSMISSION....170
  MAINTENANCE....172
    4.1 GUIDE TO MAINTENANCE....173
    4.2 MAINTENANCE NOTES....175
      4.2.1 NOTES REGARDING THE ENGINE....175
        4.2.1.1 ENGINE OIL....175
        4.2.1.2 COOLANT....175
        4.2.1.3 FUEL....176
      4.2.2 NOTES REGARDING THE HYDRAULIC SYSTEM....176
      4.2.3 NOTES REGARDING THE ELECTRICAL SYSTEM....177
      4.2.4 NOTES REGARDING LUBRICATION....177
      4.2.5 PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING....178
    4.3 FUEL, COOLANT AND LUBRICANTS....179
      4.3.1 HOMOLOGATED SYNTHETIC BIODEGRADABLE LUBRICANTS TYPE HEES....183
    4.4 DRIVING TORQUES FOR SCREWS AND NUTS....184
      4.4.1 STANDARD DRIVING TORQUES....184
      4.4.2 SPECIFIC DRIVING TORQUES....184
    4.5 LUBRICATION....185
      4.5.1 LUBRICATION DIAGRAM....185
    4.6 PERIODICAL CHANGE OF THE COMPONENTS CONNECTED WITH SAFETY....186
      4.6.1 CRITICAL PARTS FOR SAFETY....187
    4.7 MAINTENANCE PLAN....193
      4.7.1 WHEN REQUIRED....196
        4.7.1.a CHECKING, CLEANING OR CHANGING THE AIR CLEANER CARTRIDGE....196
        4.7.1.b TYRE ROTATION....197
        4.7.1.c DRAINING THE FUEL TANK....198
        4.7.1.d RELEASING THE PARKING BRAKE....199
        4.7.1.e CHECKING THE BATTERY CHARGE LEVEL....200
      4.7.2 CHECKS BEFORE STARTING....201
        4.7.2.a VARIOUS CHECKS....201
        4.7.2.b CHECKING THE COOLANT LEVEL....201
        4.7.2.c CHECKING THE FUEL LEVEL....202
        4.7.2.d CHECKING THE ENGINE OIL LEVEL....203
        4.7.2.e CHECKING THE OIL LEVEL IN THE HYDRAULIC CIRCUIT....204
        4.7.2.f CHECKING THE WATER SEPARATOR FOR SEDIMENTS AND WATER....205
        4.7.2.g CHECKING THE WIRING SYSTEM....205
      4.7.3 MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION....206
        4.7.3.a CHECK THE DRIVE CHAIN TENSION....208
        4.7.3.b CHECK THE TIGHTENING OF THE WHEEL FASTENING NUTS....210
        4.7.3.c CHANGING THE HYDRAULIC OIL DRAIN FILTER (ONLY FOR MACHINES FILLED WITH BIODEGRADABLE OIL)....217
      4.7.4 MAINTENANCE EVERY 50 HOURS OF OPERATION....206
        4.7.4.a CHECKING THE TYRE PRESSURE....206
        4.7.4.b CHECKING THE COOLANT LEVEL IN THE RADIATOR....206
      4.7.5 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION....207
        4.7.5.a CHANGING THE HYDRAULIC OIL DRAIN FILTER (ONLY FOR MACHINES FILLED WITH BIODEGRADABLE OIL)....217
      4.7.6 MAINTENANCE EVERY 250 HOURS OF OPERATION....207
        4.7.6.a ADJUSTING THE FAN BELT TENSION....207
        4.7.6.b CHECKING THE DRIVE CHAIN TENSION....208
        4.7.6.c CLEANING THE OUTSIDE OF THE RADIATORS....210
        4.7.6.d CHECKING THE WHEEL NUT DRIVING TORQUE....210
        4.7.6.e CHECKING THE OIL LEVEL IN THE FINAL TRANSMISSIONS....211
        4.7.6.f LUBRICATING THE JOINTS....212
        4.7.6.g CHANGING THE ENGINE OIL....213
        4.7.6.h CHANGING THE ENGINE OIL FILTER....214
      4.7.7 MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines filled with synthetic.....215
        4.7.7.a CHANGING THE HYDRAULIC SYSTEM OIL AND CLEANING THE SUCTION FILTER....222
      4.7.8 MAINTENANCE EVERY 500 HOURS OF OPERATION....215
        4.7.8.a CHANGING THE FUEL FILTER....215
        4.7.8.b CHANGING THE HYDRAULIC OIL DRAIN FILTER....217
        4.7.8.c CLEANING THE WATER SEPARATOR....218
        4.7.8.d DRAINING THE HYDRAULIC OIL TANK (Only for machines filled with synthetic biodegradable oi.....219
      4.7.9 MAINTENANCE EVERY 1000 HOURS OF OPERATION....221
        4.7.9.a CHANGING THE OIL IN THE FINAL TRANSMISSION....221
        4.7.9.b CHANGING THE HYDRAULIC SYSTEM OIL AND CLEANING THE SUCTION FILTER....222
        4.7.9.c CHECKING AND ADJUSTING THE ENGINE VALVE CLEARANCE....224
      4.7.10 MAINTENANCE EVERY 2000 HOURS OF OPERATION....225
        4.7.10.a CHANGING THE COOLANT....225
        4.7.10.b CHANGING THE SUCTION FILTER....227
        4.7.10.c CHECKING THE ALTERNATOR AND THE STARTER....228
  TECHNICAL SPECIFICATIONS....230
    5.1 TECHNICAL DATA....231
      5.1.1 STANDARD MACHINE OVERALL DIMENSIONS....231
      5.1.2 MACHINE OVERALL DIMENSIONS WITH OPTIONAL EQUIPMENT....233
      5.1.3 TECHNICAL CHARACTERISTICS....235
  AUTHORISED OPTIONAL EQUIPMENT....238
    6.1 AUTHORIZED OPTIONAL EQUIPMENT....239
      6.1.1 PRECAUTIONS REGARDING SAFETY....239
      6.1.2 PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT....240
      6.1.3 CHARACTERISTICS OF THE STANDARD MACHINE OPTIONAL EQUIPMENT....241
      6.1.4 CHARACTERISTICS OF THE OPTIONAL EQUIPMENT OF THE MACHINE VERSION WITH HIGH FLOW AND SUPER-F.....242
    6.2 CHANGING THE AUTHORIZED EQUIPMENT....243
      6.2.1 CONNECTING THE EXCAVATOR....243
      6.2.2 CONNECTING THE HYDRAULIC CIRCUIT....244
      6.2.3 CONNECTING THE RETURN CIRCUIT WITH DIRECT DRAINAGE INTO THE TANK....246
      6.2.4 PREPARING THE MACHINE FOR THE USE OF THE EXCAVATOR....247
      6.2.5 USING THE MACHINE WITH THE EXCAVATOR....247
    6.3 PALLET FORKS....248
WEAM004803 - Skid Steer Loader SK1020-5 Operation & Maintenance Manual....250
  COVER....250
  FOREWORD....251
    1.1 FOREWORD....251
    1.2 INFORMATION ON SAFETY....253
    1.3 INTRODUCTION....255
      1.3.1 INTENDED USES....255
      1.3.2 IMPROPER OR UNAUTHORIZED USES....255
      1.3.3 MAIN CHARACTERISTICS....255
      1.3.4 RUNNING-IN....256
    1.4 PRODUCT IDENTIFICATION....257
      1.4.1 MACHINE SERIAL NUMBER....257
      1.4.2 MACHINE IDENTIFICATION PLATE AND PRODUCT IDENTIFICATION NUMBER (PIN)....257
      1.4.3 ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE....258
      1.4.4 TRAVEL REDUCTION GEAR SERIAL NUMBER....258
      1.4.5 CAB SERIAL NUMBER....258
      1.4.6 BACKHOE IDENTIFICATION PLATE (if installed)....258
      1.4.7 SERIAL NUMBERS AND DISTRIBUTORS ADDRESS....259
  TABLE OF CONTENTS....261
  SAFETY AND ACCIDENT PREVENTION....267
    2.1 SAFETY AND WARNING DECALS....268
      2.1.1 LOCATION OF THE SAFETY DECALS....268
      2.1.2 LOCATION OF THE PICTOGRAM DECALS....283
      2.1.3 PICTOGRAMS AND RELEVANT MEANINGS....287
      2.1.4 VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED....289
    2.2 GENERAL PRECAUTIONS....290
      2.2.1 GENERAL SAFETY RULES....290
      2.2.2 SAFETY DEVICES AND GUARDS....290
      2.2.3 CLOTHING AND PERSONAL PROTECTION ITEMS....290
      2.2.4 UNAUTHORIZED MODIFICATIONS....291
      2.2.5 LEAVING THE OPERATORS SEAT....291
      2.2.6 GETTING ON AND OFF THE MACHINE....292
      2.2.7 CHECKING THE REAR-VIEW MIRRORS (if installed)....292
      2.2.8 PREVENTING FIRES DUE TO FUEL AND OIL....293
      2.2.9 PREVENTING BURNS....293
      2.2.10 PREVENTING DAMAGE DUE TO ASBESTOS POWDER....294
      2.2.11 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....294
      2.2.12 FIRE EXTINGUISHERS AND FIRST AID KIT....295
      2.2.13 PRECAUTIONS CONCERNING THE CAB STRUCTURE....295
      2.2.14 PRECAUTIONS CONCERNING THE EQUIPMENT....295
    2.3 PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE....296
      2.3.1 SAFETY ON THE WORK SITE....296
      2.3.2 FIRE PREVENTION....296
      2.3.3 PRECAUTIONS TO BE TAKEN FOR THE OPERATOR'S CAB....296
      2.3.4 ROOM VENTILATION....297
      2.3.5 PRECAUTIONS TO BE TAKEN FOR THE LIGHTS....297
      2.3.6 CLEANING THE WINDOWS AND THE REAR-VIEW MIRRORS - CHECKING THE WINDSHIELD WIPER BLADES (if installed)....297
    2.4 PRECAUTIONS TO BE TAKEN WHEN WORKING....298
      2.4.1 STARTING THE ENGINE....298
      2.4.2 CHECKS FOR TRAVELING IN REVERSE....298
      2.4.3 MOVING THE MACHINE....299
      2.4.4 WORKING ON SLOPES....299
      2.4.5 PREVENTING ELECTROCUTION....301
      2.4.6 VISIBILITY....302
      2.4.7 WORKING ON ICY OR SNOW-COVERED SURFACES....302
      2.4.8 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....302
      2.4.9 WORKING ON LOOSE GROUND....302
      2.4.10 PARKING THE MACHINE....303
    2.5 TRANSPORTING THE MACHINE ON OTHER VEHICLES....304
      2.5.1 LOADING AND UNLOADING THE MACHINE....304
      2.5.2 THE ROUTE....304
    2.6 BATTERY....305
      2.6.1 SAFETY PRECAUTIONS FOR WORK ON BATTERIES....305
      2.6.2 STARTING WITH BOOSTER CABLES....305
    2.7 PRECAUTIONS FOR EMERGENCY RECOVERY....306
    2.8 PRECAUTIONS TO BE TAKEN DURING MAINTENANCE....308
      2.8.1 WARNING TAGS....308
      2.8.2 TOOLS....308
      2.8.3 PERSONNEL....309
      2.8.4 EQUIPMENT....309
      2.8.5 WORKING UNDER THE MACHINE....309
      2.8.6 KEEPING THE MACHINE CLEAN....309
      2.8.7 USE OF THE ENGINE DURING MAINTENANCE....310
      2.8.8 PERIODICAL CHANGE OF THE PARTS THAT ARE CRITICAL FOR SAFETY....310
      2.8.9 STOP THE ENGINE BEFORE CARRYING OUT ANY MAINTENANCE OPERATION OR INSPECTION....310
      2.8.10 RULES FOR REFUELING AND ADDING OIL....311
      2.8.11 CHECKING THE COOLANT LEVEL IN THE RADIATOR....311
      2.8.12 USING LAMPS....311
      2.8.13 PRECAUTIONS CONCERNING THE BATTERY AND THE ALTERNATOR....312
      2.8.14 PRECAUTIONS CONCERNING THE STARTER....312
      2.8.15 PRECAUTIONS CONCERNING HIGH-PRESSURE HOSES....313
      2.8.16 PRECAUTIONS TO BE TAKEN WHEN WORKING ON HIGH-PRES SURE SYSTEMS....313
      2.8.17 PRECAUTIONS FOR MAINTENANCE WORK INVOLVING HIGH TEMPERATURES AND PRESSU RES....313
      2.8.18 COOLING FAN AND FAN BELT....314
      2.8.19 WASTE MATERIALS....314
      2.8.20 PRECAUTIONS TO BE TAKEN WHEN INFLATING THE TIRES....314
      2.8.21 PRECAUTIONS TO BE TAKEN WHEN USING THE SYNTHETIC BIODEGRADABLE OIL TYPE HEES....315
  THE MACHINE AND ITS OPERATION....317
    3.1 SAFETY LOCKS....318
      3.1.1 LOADER ARM SUPPORT....318
      3.1.2 BACKHOE LOCKS (if installed)....320
      3.1.3 COLD PLANER LOCKS (if installed)....322
    3.2 GENERAL VIEWS....323
      3.2.1 FRONT GENERAL VIEW....323
      3.2.2 REAR GENERAL VIEW....324
      3.2.3 CAB INSIDE GENERAL VIEW....325
    3.3 INSTRUMENTS AND CONTROLS....327
      3.3.1 INSTRUMENTS....327
      3.3.2 INDICATOR LIGHTS....329
      3.3.3 SWITCHES AND PUSH BUTTONS....334
      3.3.4 ELECTRICAL ACCESSORIES....339
      3.3.5 MACHINE CONTROLS....341
    3.4 FUSES AND RELAYS....363
      3.4.1 MACHINE FUNCTION FUSES....363
      3.4.2 MAIN FUSE....364
      3.4.3 RELAYS....365
    3.5 GUARDS AND OPERATORS SEAT....367
      3.5.1 ENGINE HOOD....367
      3.5.2 REAR PANEL....368
      3.5.3 CAB....369
        3.5.3.1 TILTING THE CAB....370
      3.5.4 STANDARD SEAT....372
      3.5.5 CUSHIONED SEAT....372
      3.5.6 SEAT BELT....373
      3.5.7 EMERGENCY EXIT....373
      3.5.8 TECHNICAL DOCUMENTATION CASE....374
      3.5.9 FIRE EXTINGUISHER....374
      3.5.10 FIRST AID KIT....374
    3.6 USE OF THE MACHINE....375
      3.6.1 CHECKS BEFORE STARTING THE ENGINE....375
        3.6.1.1 VISUAL CHECKS....375
        3.6.1.2 DAILY CHECKS....375
        3.6.1.3 OPERATIONAL CHECKS....376
      3.6.2 STARTING THE ENGINE....377
        3.6.2.1 STARTING WITH WARM ENGINE OR IN TEMPERATE CLIMATES....377
        3.6.2.2 STARTING WITH COLD ENGINE OR IN COLD CLIMATES....378
      3.6.3 WARMING THE ENGINE....379
      3.6.4 HEATING THE HYDRAULIC OIL....379
      3.6.5 HOW TO MOVE THE MACHINE (ISO PATTERN CONTROL SYSTEM)....379
        3.6.5.1 STEERING (CHANGING DIRECTION)....381
      3.6.6 HOW TO MOVE THE MACHINE (OPTIONAL PATTERN CONTROL SYS TEM)....383
        3.6.6.1 STEERING (CHANGING DIRECTION)....385
      3.6.7 MOVING ON SLOPES....387
      3.6.8 MAXIMUM IMMERSION DEPTH....388
    3.7 PARKING THE MACHINE....389
      3.7.1 PARKING ON LEVEL GROUND....389
      3.7.2 PARKING ON SLOPES....390
    3.8 STOPPING THE ENGINE....391
    3.9 TRANSPORTING THE MACHINE ON OTHER VEHICLES....392
      3.9.1 LOADING AND UNLOADING THE MACHINE....392
      3.9.2 TRANSPORT....393
    3.10 HOW TO LIFT THE MACHINE....394
    3.11 PRECAUTIONS TO BE TAKEN IN THE COLD SEASON....395
      3.11.1 FUEL AND LUBRICANTS....395
      3.11.2 COOLANT....395
      3.11.3 BATTERY....396
      3.11.4 OTHER PRECAUTIONS....396
      3.11.5 PRECAUTIONS TO BE TAKEN AT THE END OF WORK....396
    3.12 PRECAUTIONS TO BE TAKEN IN THE WARM SEASON....397
    3.13 USING THE WORK EQUIPMENT....398
      3.13.1 LOWERING THE EQUIPMENT IN CASE OF MACHINE FAILURE....398
      3.13.2 ORGANIZING THE WORK AREA....399
      3.13.3 LOADING MATERIAL ON HEAPS AND ON LEVEL SURFACES....400
      3.13.4 LOADING MATERIAL ON SLOPES....401
      3.13.5 DIGGING METHOD....402
      3.13.6 CHANGING THE BUCKET OR ATTACHMENT WITH STANDARD QUICK COUPLER....403
        3.13.6.1 REMOVING THE BUCKET OR ATTACH MENT....404
        3.13.6.2 ATTACHING THE BUCKET....405
        3.13.6.3 CHECKING THE POSITION OF THE LOCKING PINS....406
        3.13.6.4 ADJUSTING THE LOCKING PINS....407
    3.14 LONG PERIODS OF INACTIVITY....408
      3.14.1 BEFORE THE PERIOD OF INACTIVITY....408
      3.14.2 DURING THE PERIOD OF INACTIVITY....409
      3.14.3 AFTER THE PERIOD OF INACTIVITY....409
    3.15 TROUBLESHOOTING....410
      3.15.1 HOW TO REMOVE THE MACHINE....410
      3.15.2 IF THE FUEL HAS BEEN COMPLETELY DEPLETED....410
      3.15.3 IF THE BATTERY IS DEPLETED....411
        3.15.3.1 STARTING WITH BOOSTER CABLES....412
      3.15.4 OTHER TROUBLES....413
        3.15.4.1 ELECTRICAL CIRCUIT....413
        3.15.4.2 HYDRAULIC SYSTEM....414
        3.15.4.3 ENGINE....414
        3.15.4.4 HYDROSTATIC TRANSMISSION....415
  MAINTENANCE....417
    4.1 GUIDE TO MAINTENANCE....418
    4.2 MAINTENANCE NOTES....420
      4.2.1 NOTES REGARDING THE ENGINE....420
        4.2.1.1 ENGINE OIL....420
        4.2.1.2 COOLANT....420
      4.2.2 NOTES REGARDING THE HYDRAULIC SYSTEM....421
      4.2.3 NOTES REGARDING THE ELECTRICAL SYSTEM....421
      4.2.4 NOTES REGARDING LUBRICATION....422
      4.2.5 PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING....423
    4.3 FUEL, COOLANT AND LUBRICANTS....424
      4.3.1 APPROVED SYNTHETIC BIODEGRADABLE LUBRICANTS TYPE HEES....428
    4.4 DRIVING TORQUES FOR SCREWS AND NUTS....429
      4.4.1 STANDARD DRIVING TORQUES....429
      4.4.2 SPECIFIC DRIVING TORQUES....429
    4.5 LUBRICATION....430
      4.5.1 LUBRICATION DIAGRAM....430
    4.6 PERIODICAL CHANGE OF THE COMPONENTS CONNECTED WITH SAFETY....431
      4.6.1 CRITICAL PARTS FOR SAFETY....432
    4.7 MAINTENANCE PLAN....438
    4.8 MAINTENANCE PROCEDURE....440
      4.8.1 WHEN REQUIRED....440
        4.8.1.a CHECKING, CLEANING OR CHANGING THE AIR CLEANER CARTRIDGE....440
        4.8.1.b TIRE ROTATION....441
        4.8.1.c DRAINING THE FUEL TANK....442
        4.8.1.d RELEASING THE PARKING BRAKE....443
        4.8.1.e CHECKING THE BATTERY CHARGE LEVEL....444
      4.8.2 CHECKS BEFORE STARTING....445
        4.8.2.a VARIOUS CHECKS....445
        4.8.2.b CHECKING THE COOLANT LEVEL....445
        4.8.2.c CHECKING THE FUEL LEVEL....446
        4.8.2.d CHECKING THE ENGINE OIL LEVEL....447
        4.8.2.e CHECKING THE OIL LEVEL IN THE HYDRAULIC CIRCUIT....448
        4.8.2.f CHECKING THE WATER SEPARATOR FOR SEDIMENTS AND WATER....449
        4.8.2.g CHECKING THE WIRING SYSTEM....449
      4.8.3 MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION....450
      4.8.4 MAINTENANCE EVERY 50 HOURS OF OPERATION....450
        4.8.4.a CHECKING THE TIRE PRESSURE....450
        4.8.4.b CHECKING THE COOLANT LEVEL IN THE RADIATOR....450
      4.8.5 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION....451
      4.8.6 MAINTENANCE EVERY 250 HOURS OF OPERATION....451
        4.8.6.a ADJUSTING THE FAN BELT TENSION....451
        4.8.6.b CHECKING THE GEARING CHAIN TEN SION....452
        4.8.6.c CLEANING THE OUTSIDE OF THE RADIATORS....454
        4.8.6.d CHECKING THE WHEEL NUT DRIVING TORQUE....454
        4.8.6.e CHECKING THE OIL LEVEL IN THE FINAL TRANSMISSIONS....455
        4.8.6.f LUBRICATING THE JOINTS....456
        4.8.6.g CHANGING THE ENGINE OIL....457
        4.8.6.h CHANGING THE ENGINE OIL FILTER....458
      4.8.7 MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines filled with synthetic biodegradable oil type HEES)....459
      4.8.8 MAINTENANCE EVERY 500 HOURS OF OPERATION....459
        4.8.8.a CHANGING THE FUEL FILTER....459
        4.8.8.b CHANGING THE HYDRAULIC OIL DRAIN FILTER....461
        4.8.8.c CLEANING THE WATER SEPARATOR....462
        4.8.8.d DRAINING THE HYDRAULIC OIL TANK (Only for machines filled with synthetic biodegradable oil type HEES)....463
      4.8.9 MAINTENANCE EVERY 1000 HOURS OF OPERATION....465
        4.8.9.a CHANGING THE OIL IN THE FINAL TRANSMISSION....465
        4.8.9.b CHANGING THE HYDRAULIC SYSTEM OIL AND CLEANING THE SUCTION FIL TER....466
        4.8.9.c CHECKING AND ADJUSTING THE ENGINE VALVE CLEARANCE....468
      4.8.10 MAINTENANCE EVERY 2000 HOURS OF OPERATION....469
        4.8.10.a CHANGING THE COOLANT....469
        4.8.10.b CHANGING THE SUCTION FILTER....470
        4.8.10.c CHECKING THE ALTERNATOR AND THE STARTER....471
  TECHNICAL SPECIFICATIONS....473
    5.1 TECHNICAL DATA....474
      5.1.1 STANDARD MACHINE OVERALL DIMENSIONS....474
      5.1.2 MACHINE OVERALL DIMENSIONS WITH OPTIONAL EQUIPMENT....475
      5.1.3 TECHNICAL CHARACTERISTICS....476
  AUTHORIZED OPTIONAL EQUIPMENT....479
    6.1 AUTHORIZED OPTIONAL EQUIPMENT....480
      6.1.1 PRECAUTIONS REGARDING SAFETY....480
      6.1.2 PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT....480
      6.1.3 CHARACTERISTICS OF THE STANDARD MACHINE OPTIONAL EQUIPMENT....481
      6.1.4 CHARACTERISTICS OF THE OPTIONAL EQUIPMENT OF THE MACHINE VERSION WITH SUPER-FLOW HYDRAULIC SYSTEM....482
    6.2 CHANGING THE AUTHORIZED EQUIPMENT....483
      6.2.1 CONNECTING THE BACKHOE....483
      6.2.2 CONNECTING THE HYDRAULIC CIRCUIT....484
      6.2.3 CONNECTING THE RETURN CIR CUIT WITH DIRECT DRAINAGE INTO THE TANK....486
      6.2.4 PREPARING THE MACHINE FOR THE USE OF THE BACKHOE....487
      6.2.5 USING THE MACHINE WITH THE BACKHOE....487
    6.3 PALLET FORKS....488
    6.4 HAND & FOOT CONTROL SYSTEM....489
      6.4.1 MACHINE CONTROLS....489
        6.4.1.1 TRAVEL AND STEERING CONTROL LEVERS....490
        6.4.1.2 WORK EQUIPMENT CONTROL PEDALS (LOADER ARM AND BUCKET)....492
        6.4.1.3 AUXILIARY HYDRAULIC CONTROL LEVER....495
      6.4.2 HOW TO MOVE THE MACHINE (HAND & FOOT CONTROL SYSTEM)....498
        6.4.2.1 STEERING (CHANGING DIRECTION)....500
WEAM005205 - Skid Steer Loader SK1020-5 turbo Operation & Maintenance Manual....503
  1.1 FOREWORD....505
  1.2 INFORMATION ON SAFETY....506
  1.3 INTRODUCTION....508
    1.3.1 INTENDED USES....508
    1.3.2 IMPROPER OR UNAUTHORIZED USES....508
    1.3.3 MAIN CHARACTERISTICS....508
    1.3.4 RUNNING-IN....509
  1.4 PRODUCT IDENTIFICATION....510
    1.4.1 MACHINE SERIAL NUMBER....510
    1.4.2 MACHINE IDENTIFICATION PLATE AND PRODUCT IDENTIFICATION NUMBER (PIN)....510
    1.4.3 ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE....511
    1.4.4 TRAVEL REDUCTION GEAR SERIAL NUMBER....511
    1.4.5 CAB SERIAL NUMBER....511
    1.4.6 EXCAVATOR IDENTIFICATION PLATE (if installed)....511
    1.4.7 SERIAL NUMBERS AND DEALERS ADDRESS....512
  TABLE OF CONTENTS....513
  2.1 SAFETY, NOISE AND VIBRATION PLATES....520
    2.1.1 POSITION OF THE SAFETY PLATES....520
      2.1.1.1 SAFETY PLATES....520
      2.1.1.2 SAFETY PLATES FOR MACHINES WITH EXCAVATOR....522
    2.1.2 PICTOGRAMS AND RELEVANT MEANINGS....524
    2.1.3 POSITION OF THE NOISE PLATES....527
    2.1.4 VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED....527
  2.2 GENERAL PRECAUTIONS....528
    2.2.1 GENERAL SAFETY RULES....528
    2.2.2 SAFETY DEVICES AND GUARDS....528
    2.2.3 CLOTHING AND PERSONAL PRO TECTION ITEMS....528
    2.2.4 UNAUTHORIZED MODIFICATIONS....529
    2.2.5 LEAVING THE OPERATORS SEAT....529
    2.2.6 GETTING ON AND OFF THE MACHINE....530
    2.2.7 CHECKING THE REAR-VIEW MIR RORS (if installed)....530
    2.2.8 PREVENTING FIRES DUE TO FUEL AND OIL....531
    2.2.9 PREVENTING BURNS....531
    2.2.10 PREVENTING DAMAGE DUE TO ASBESTOS POWDER....532
    2.2.11 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....532
    2.2.12 FIRE EXTINGUISHERS AND FIRST AID KIT....533
    2.2.13 PRECAUTIONS CONCERNING THE CAB STRUCTURE....533
    2.2.14 PRECAUTIONS CONCERNING THE EQUIPMENT....533
  2.3 PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE....534
    2.3.1 SAFETY ON THE WORK SITE....534
    2.3.2 FIRE PREVENTION....534
    2.3.3 PRECAUTIONS TO BE TAKEN FOR THE OPERATOR'S CAB....534
    2.3.4 ROOM VENTILATION....535
    2.3.5 PRECAUTIONS TO BE TAKEN FOR THE LIGHTS (if installed)....535
    2.3.6 CLEANING THE WINDOWS AND THE REAR-VIEW MIRRORS - CHECKING THE WINDSHIELD WIPER BLADES (if installed)....535
  2.4 PRECAUTIONS TO BE TAKEN WHEN WORKING....536
    2.4.1 STARTING THE ENGINE....536
    2.4.2 RULES TO BE FOLLOWED WHEN TRAVELLING ON ROADS....536
    2.4.3 CHECKS FOR TRAVELLING IN REVERSE....537
    2.4.4 MOVING THE MACHINE....538
    2.4.5 WORKING ON SLOPES....538
    2.4.6 PREVENTING ELECTROCUTION....540
    2.4.7 VISIBILITY....541
    2.4.8 WORKING ON ICY OR SNOW-COVERED SURFACES....541
    2.4.9 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....541
    2.4.10 WORKING ON LOOSE GROUND....541
    2.4.11 PARKING THE MACHINE....542
  2.5 TRANSPORTING THE MACHINE ON OTHER VEHICLES....543
    2.5.1 LOADING AND UNLOADING THE MACHINE....543
    2.5.2 THE ROUTE....543
  2.6 BATTERY....544
    2.6.1 SAFETY PRECAUTIONS FOR WORK ON BATTERIES....544
    2.6.2 STARTING WITH BOOSTER CABLES....544
  2.7 PRECAUTIONS FOR EMERGENCY RECOVERY....545
  2.8 PRECAUTIONS TO BE TAKEN DURING MAINTENANCE....547
    2.8.1 WARNING PLATES....547
    2.8.2 TOOLS....547
    2.8.3 PERSONNEL....548
    2.8.4 EQUIPMENT....548
    2.8.5 WORKING UNDER THE MACHINE....548
    2.8.6 KEEPING THE MACHINE CLEAN....548
    2.8.7 USE OF THE ENGINE DURING MAINTENANCE....549
    2.8.8 PERIODICAL CHANGE OF THE PARTS THAT ARE CRITICAL FOR SAFETY....549
    2.8.9 STOP THE ENGINE BEFORE CAR RYING OUT ANY MAINTENANCE OPERATION OR INSPECTION....549
    2.8.10 RULES FOR REFUELLING AND ADDING OIL....550
    2.8.11 CHECKING THE COOLANT LEVEL IN THE RADIATOR....550
    2.8.12 USING LAMPS....550
    2.8.13 PRECAUTIONS CONCERNING THE BATTERY AND THE ALTERNATOR....551
    2.8.14 PRECAUTIONS CONCERNING THE STARTER....551
    2.8.15 PRECAUTIONS CONCERNING HIGH-PRESSURE HOSES....552
    2.8.16 PRECAUTIONS TO BE TAKEN WHEN WORKING ON HIGH-PRES SURE SYSTEMS....552
    2.8.17 PRECAUTIONS FOR MAINTE NANCE WORK INVOLVING HIGH TEMPERATURES AND PRES SURES....552
    2.8.18 COOLING FAN AND FAN BELT....553
    2.8.19 WASTE MATERIALS....553
    2.8.20 PRECAUTIONS TO BE TAKEN WHEN INFLATING THE TYRES....553
    2.8.21 PRECAUTIONS TO BE TAKEN WHEN USING THE SYNTHETIC BIODE GRADABLE OIL TYPE HEES....554
  3.1 SAFETY LOCKS....556
    3.1.1 LOADER LOCKS....556
    3.1.2 EXCAVATOR LOCKS (if installed)....558
    3.1.3 ASPHALT CUTTER LOCKS (if installed)....560
  3.2 GENERAL VIEWS....561
    3.2.1 FRONT GENERAL VIEW....561
    3.2.2 REAR GENERAL VIEW....562
    3.2.3 CAB INSIDE GENERAL VIEW....563
  3.3 INSTRUMENTS AND CONTROLS....565
    3.3.1 INSTRUMENTS....565
    3.3.2 WARNING LIGHTS....567
    3.3.3 SWITCHES UND PUSH BUTTONS....572
    3.3.4 ELECTRICAL ACCESSORIES....578
    3.3.5 MACHINE CONTROLS....580
  3.4 FUSES AND RELAYS....600
    3.4.1 MACHINE FUNCTION FUSES....600
    3.4.2 MAIN FUSE....601
    3.4.3 RELAYS....602
  3.5 GUARDS AND DRIVERS SEAT....604
    3.5.1 ENGINE HOOD....604
    3.5.2 REAR PANEL....605
    3.5.3 CAB....606
      3.5.3.1 STANDARD CAB....606
      3.5.3.2 CAB WITH FRONT DOOR AND SIDE WINDOWS (available on request)....606
      3.5.3.3 WINDSHIELD DETERGENT RESER VOIR (only for cab with front door)....608
      3.5.3.4 RAISING THE CAB....609
    3.5.4 STANDARD SEAT....611
    3.5.5 CUSHIONED SEAT....611
    3.5.6 SAFETY BELT....612
    3.5.7 EMERGENCY EXIT....612
    3.5.8 TECHNICAL DOCUMENTATION CASE....613
    3.5.9 FIRE EXTINGUISHER....613
    3.5.10 FIRST AID KIT....613
  3.6 USE OF THE MACHINE....614
    3.6.1 CHECKS BEFORE STARTING THE ENGINE....614
      3.6.1.1 VISUAL CHECKS....614
      3.6.1.2 DAILY CHECKS....614
      3.6.1.3 OPERATIONAL CHECKS....615
    3.6.2 STARTING THE ENGINE....616
      3.6.2.1 STARTING WITH WARM ENGINE OR IN TEMPERATE CLIMATES....616
      3.6.2.2 STARTING WITH COLD ENGINE OR IN COLD CLIMATES....617
    3.6.3 WARMING THE ENGINE....618
    3.6.4 HEATING THE HYDRAULIC OIL....618
    3.6.5 HOW TO MOVE THE MACHINE (ISO PATTERN CONTROL SYSTEMERN)....618
      3.6.5.1 STEERING (CHANGING DIRECTION)....620
    3.6.6 HOW TO MOVE THE MACHINE (OPTIONAL PATTERN CONTROL SYS TEM)....622
      3.6.6.1 STEERING (CHANGING DIRECTION)....624
    3.6.7 MOVING ON SLOPES....626
    3.6.8 MAXIMUM IMMERSION DEPTH....627
  3.7 PARKING THE MACHINE....628
    3.7.1 PARKING ON LEVEL GROUND....628
    3.7.2 PARKING ON SLOPES....629
  3.8 STOPPING THE ENGINE....630
  3.9 TRANSPORTING THE MACHINE ON OTHER VEHICLES....631
    3.9.1 LOADING AND UNLOADING THE MACHINE....631
    3.9.2 TRANSPORT....632
  3.10 HOW TO LIFT THE MACHINE....633
  3.11 PRECAUTIONS TO BE TAKEN IN THE COLD SEASON....634
    3.11.1 FUEL AND LUBRICANTS....634
    3.11.2 COOLANT....634
    3.11.3 BATTERY....635
    3.11.4 OTHER PRECAUTIONS....635
    3.11.5 PRECAUTIONS TO BE TAKEN AT THE END OF WORK....635
  3.12 PRECAUTIONS TO BE TAKEN IN THE WARM SEASON....636
  3.13 USING THE WORK EQUIPMENT....637
    3.13.1 LOWERING THE EQUIPMENT IN CASE OF MACHINE FAILURE....637
    3.13.2 ORGANIZING THE WORK ARE....638
    3.13.3 LOADING MATERIAL ON HEAPS AND ON LEVEL SURFACES....639
    3.13.4 LOADING MATERIAL ON SLOPES....640
    3.13.5 DIGGING METHOD....641
    3.13.6 CHANGING THE BUCKET OR THE EQUIPMENT WITH STANDARD RAPID COUPLING....642
      3.13.6.1 REMOVING THE BUCKET OR THE EQUIPMENT....643
      3.13.6.2 CONNECTING THE BUCKET....644
      3.13.6.3 CHECKING THE POSITION OF THE LOCKING PINS....645
      3.13.6.4 ADJUSTING THE LOCKING PINS....646
  3.14 LONG PERIODS OF INACTIVITY....647
    3.14.1 BEFORE THE PERIOD OF INACTIV ITY....647
    3.14.2 DURING THE PERIOD OF INACTIVITY....648
    3.14.3 AFTER THE PERIOD OF INACTIVITY....648
  3.15 TROUBLESHOOTING....649
    3.15.1 HOW TO REMOVE THE MACHINE....649
    3.15.2 IF THE FUEL HAS BEEN COM PLETELY DEPLETED....649
    3.15.3 IF THE BATTERY IS DEPLETED....650
      3.15.3.1 STARTING WITH BOOSTER CABLES....651
    3.15.4 OTHER TROUBLES....652
      3.15.4.1 ELECTRICAL CIRCUIT....652
      3.15.4.2 HYDRAULIC SYSTEM....652
      3.15.4.3 ENGINE....653
      3.15.4.4 HYDROSTATIC TRANSMISSION....654
  4.1 GUIDE TO MAINTENANCE....658
  4.2 MAINTENANCE NOTES....660
    4.2.1 NOTES REGARDING THE ENGINE....660
      4.2.1.1 ENGINE OIL....660
      4.2.1.2 COOLANT....660
      4.2.1.3 FUEL....661
    4.2.2 NOTES REGARDING THE HYDRAULIC SYSTEM....661
    4.2.3 NOTES REGARDING THE ELECTRICAL SYSTEM....661
    4.2.4 NOTES REGARDING LUBRICATION....662
    4.2.5 PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING....662
  4.3 FUEL, COOLANT AND LUBRICANTS....663
    4.3.1 HOMOLOGATED SYNTHETIC BIODEGRADABLE LUBRICANTS TYPE HEES....665
  4.4 DRIVING TORQUES FOR SCREWS AND NUTS....666
    4.4.1 STANDARD DRIVING TORQUES....666
    4.4.2 SPECIFIC DRIVING TORQUES....666
  4.5 LUBRICATION....667
    4.5.1 LUBRICATION DIAGRAM....667
  4.6 PERIODICAL CHANGE OF THE COMPONENTS CONNECTED WITH SAFETY....668
    4.6.1 CRITICAL PARTS FOR SAFETY....669
  4.7 MAINTENANCE PLAN....675
  4.8 MAINTENANCE PROCEDURE....677
    4.8.1 WHEN REQUIRED....677
      4.8.1.a CHECKING, CLEANING OR CHANGING THE AIR CLEANER CARTRIDGE....677
      4.8.1.b TYRE ROTATION....678
      4.8.1.c DRAINING THE FUEL TANK....679
      4.8.1.d RELEASING THE PARKING BRAKE....680
      4.8.1.e CHECKING THE BATTERY CHARGE LEVEL....681
    4.8.2 CHECKS BEFORE STARTING....682
      4.8.2.a VARIOUS CHECKS....682
      4.8.2.b CHECKING THE COOLANT LEVEL....682
      4.8.2.c CHECKING THE FUEL LEVEL....683
      4.8.2.d CHECKING THE ENGINE OIL LEVEL....684
      4.8.2.e CHECKING THE OIL LEVEL IN THE HYDRAULIC CIRCUIT....685
      4.8.2.f CHECKING THE WATER SEPARATOR FOR SEDIMENTS AND WATER....686
      4.8.2.g CHECKING THE WIRING SYSTEM....686
    4.8.3 MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION....687
    4.8.4 MAINTENANCE EVERY 50 HOURS OF OPERATION....687
      4.8.4.a CHECKING THE TYRE PRESSURE....687
      4.8.4.b CHECKING THE COOLANT LEVEL IN THE RADIATOR....687
    4.8.5 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION....688
    4.8.6 MAINTENANCE EVERY 250 HOURS OF OPERATION....688
      4.8.6.a ADJUSTING THE FAN BELT TENSION....688
      4.8.6.b CHECKING THE GEARING CHAIN TEN SION....689
      4.8.6.c CLEANING THE OUTSIDE OF THE RADIATORS....691
      4.8.6.d CHECKING THE WHEEL NUT DRIVING TORQUE....691
      4.8.6.e CHECKING THE OIL LEVEL IN THE FINAL TRANSMISSIONS....692
      4.8.6.f LUBRICATING THE JOINTS....693
      4.8.6.g CHANGING THE ENGINE OIL....694
      4.8.6.h CHANGING THE ENGINE OIL FILTER....695
    4.8.7 MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines filled with synthetic biodegradable oil type HEES)....696
    4.8.8 MAINTENANCE EVERY 500 HOURS OF OPERATION....696
      4.8.8.a CHANGING THE FUEL FILTER....696
      4.8.8.b CHANGING THE HYDRAULIC OIL DRAIN FILTER....698
      4.8.8.c CLEANING THE WATER SEPARATOR....699
      4.8.8.d DRAINING THE HYDRAULIC OIL TANK (Only for machines filled with synthetic biodegradable oil type HEES)....700
    4.8.9 MAINTENANCE EVERY 1000 HOURS OF OPERATION....701
      4.8.9.a CHANGING THE OIL IN THE FINAL TRANSMISSION....701
      4.8.9.b CHANGING THE HYDRAULIC SYSTEM OIL AND CLEANING THE SUCTION FIL TER....702
      4.8.9.c CHECKING AND ADJUSTING THE ENGINE VALVE CLEARANCE....703
    4.8.10 MANUTENZIONE OGNI 2000 ORE....704
      4.8.10.a CHANGING THE COOLANT....704
      4.8.10.b CHANGING THE SUCTION FILTER....705
      4.8.10.c CHECKING THE ALTERNATOR AND THE STARTER....706
  5.1 TECHNICAL DATA....708
    5.1.1 STANDARD MACHINE OVERALL DIMENSIONS....708
    5.1.2 MACHINE OVERALL DIMENSIONS WITH OPTIONAL EQUIPMENT....709
    5.1.3 TECHNICAL CHARACTERISTICS....710
  6.1 AUTHORIZED OPTIONAL EQUIPMENT....712
    6.1.1 PRECAUTIONS REGARDING SAFETY....712
    6.1.2 PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT....713
    6.1.3 CHARACTERISTICS OF THE STANDARD MACHINE OPTIONAL EQUIPMENT....714
    6.1.4 CHARACTERISTICS OF THE OPTIONAL EQUIPMENT OF THE MACHINE VERSION WITH HIGH FLOW AND SUPER-FLOW HYDRAU LIC SYSTEM....715
  6.2 CHANGING THE AUTHORIZED EQUIPMENT....716
    6.2.1 CONNECTING THE EXCAVATOR....716
    6.2.2 CONNECTING THE HYDRAULIC CIRCUIT....717
    6.2.3 CONNECTING THE RETURN CIR CUIT WITH DIRECT DRAINAGE INTO THE TANK....719
    6.2.4 PREPARING THE MACHINE FOR THE USE OF THE EXCAVATOR....720
    6.2.5 USING THE MACHINE WITH THE EXCAVATOR....720
  6.3 PALLET FORKS....721
  6.4 CHANGING THE OPERATING PATTERN....722
    6.4.1 HOW TO CHANGE THE OPERAT ING PATTERN....724
  6.5 HAND & FOOT CONTROL SYSTEM....725
    6.5.1 MACHINE CONTROLS....725
      6.5.1.1 TRAVEL AND STEERING CONTROL LEVERS....726
      6.5.1.2 WORK EQUIPMENT CONTROL PEDALS (LOADER ARM AND BUCKET)....728
      6.5.1.3 AUXILIARY HYDRAULIC KIT CONTROL....731
    6.5.2 HOW TO MOVE THE MACHINE (HAND & FOOT CONTROL SYSTEM)....734
      6.5.2.1 STEERING (CHANGING DIRECTION)....736
WEAM005502 - Skid Steer Loader SK1020-5 turbo Operation & Maintenance Manual....741
  COVER....741
  FOREWORD....742
    1.1 FOREWORD....742
    1.2 INFORMATION ON SAFETY....744
    1.3 INTRODUCTION....746
      1.3.1 INTENDED USES....746
      1.3.2 IMPROPER OR UNAUTHORIZED USES....746
      1.3.3 MAIN CHARACTERISTICS....746
      1.3.4 RUNNING-IN....747
    1.4 PRODUCT IDENTIFICATION....748
      1.4.1 MACHINE SERIAL NUMBER....748
      1.4.2 MACHINE IDENTIFICATION PLATE AND PRODUCT IDENTIFICATION NUMBER (PIN)....748
      1.4.3 ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE....749
      1.4.4 TRAVEL REDUCTION GEAR SERIAL NUMBER....749
      1.4.5 CAB SERIAL NUMBER....749
      1.4.6 BACKHOE IDENTIFICATION PLATE (if installed)....749
      1.4.7 SERIAL NUMBERS AND DISTRIBUTORS ADDRESS....750
  TABLE OF CONTENTS....752
  SAFETY AND ACCIDENT PREVENTION....758
    2.1 SAFETY AND WARNING DECALS....759
      2.1.1 LOCATION OF THE SAFETY DECALS....759
      2.1.2 LOCATION OF THE PICTOGRAM DECALS....774
      2.1.3 PICTOGRAMS AND RELEVANT MEANINGS....778
      2.1.4 VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED....780
    2.2 GENERAL PRECAUTIONS....781
      2.2.1 GENERAL SAFETY RULES....781
      2.2.2 SAFETY DEVICES AND GUARDS....781
      2.2.3 CLOTHING AND PERSONAL PROTECTION ITEMS....781
      2.2.4 UNAUTHORIZED MODIFICATIONS....782
      2.2.5 LEAVING THE OPERATORS SEAT....782
      2.2.6 GETTING ON AND OFF THE MACHINE....783
      2.2.7 CHECKING THE REAR-VIEW MIRRORS (if installed)....783
      2.2.8 PREVENTING FIRES DUE TO FUEL AND OIL....784
      2.2.9 PREVENTING BURNS....784
      2.2.10 PREVENTING DAMAGE DUE TO ASBESTOS POWDER....785
      2.2.11 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....785
      2.2.12 FIRE EXTINGUISHERS AND FIRST AID KIT....786
      2.2.13 PRECAUTIONS CONCERNING THE CAB STRUCTURE....786
      2.2.14 PRECAUTIONS CONCERNING THE EQUIPMENT....786
    2.3 PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE....787
      2.3.1 SAFETY ON THE WORK SITE....787
      2.3.2 FIRE PREVENTION....787
      2.3.3 PRECAUTIONS TO BE TAKEN FOR THE OPERATOR'S CAB....787
      2.3.4 ROOM VENTILATION....788
      2.3.5 PRECAUTIONS TO BE TAKEN FOR THE LIGHTS....788
      2.3.6 CLEANING THE WINDOWS AND THE REAR-VIEW MIRRORS - CHECKING THE WINDSHIELD WIPER BLADES (if installed)....788
    2.4 PRECAUTIONS TO BE TAKEN WHEN WORKING....789
      2.4.1 STARTING THE ENGINE....789
      2.4.2 CHECKS FOR TRAVELING IN REVERSE....789
      2.4.3 MOVING THE MACHINE....790
      2.4.4 WORKING ON SLOPES....790
      2.4.5 PREVENTING ELECTROCUTION....792
      2.4.6 VISIBILITY....793
      2.4.7 WORKING ON ICY OR SNOW-COVERED SURFACES....793
      2.4.8 PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT....793
      2.4.9 WORKING ON LOOSE GROUND....793
      2.4.10 PARKING THE MACHINE....794
    2.5 TRANSPORTING THE MACHINE ON OTHER VEHICLES....795
      2.5.1 LOADING AND UNLOADING THE MACHINE....795
      2.5.2 THE ROUTE....795
    2.6 BATTERY....796
      2.6.1 SAFETY PRECAUTIONS FOR WORK ON BATTERIES....796
      2.6.2 STARTING WITH BOOSTER CABLES....796
    2.7 PRECAUTIONS FOR EMERGENCY RECOVERY....797
    2.8 PRECAUTIONS TO BE TAKEN DURING MAINTENANCE....799
      2.8.1 WARNING TAGS....799
      2.8.2 TOOLS....799
      2.8.3 PERSONNEL....800
      2.8.4 EQUIPMENT....800
      2.8.5 WORKING UNDER THE MACHINE....800
      2.8.6 KEEPING THE MACHINE CLEAN....800
      2.8.7 USE OF THE ENGINE DURING MAINTENANCE....801
      2.8.8 PERIODICAL CHANGE OF THE PARTS THAT ARE CRITICAL FOR SAFETY....801
      2.8.9 STOP THE ENGINE BEFORE CARRYING OUT ANY MAINTENANCE OPERATION OR INSPECTION....801
      2.8.10 RULES FOR REFUELING AND ADDING OIL....802
      2.8.11 CHECKING THE COOLANT LEVEL IN THE RADIATOR....802
      2.8.12 USING LAMPS....802
      2.8.13 PRECAUTIONS CONCERNING THE BATTERY AND THE ALTERNATOR....803
      2.8.14 PRECAUTIONS CONCERNING THE STARTER....803
      2.8.15 PRECAUTIONS CONCERNING HIGH-PRESSURE HOSES....804
      2.8.16 PRECAUTIONS TO BE TAKEN WHEN WORKING ON HIGH-PRESSURE SYSTEMS....804
      2.8.17 PRECAUTIONS FOR MAINTENANCE WORK INVOLVING HIGH TEMPERATURES AND PRESSURES....804
      2.8.18 COOLING FAN AND FAN BELT....805
      2.8.19 WASTE MATERIALS....805
      2.8.20 PRECAUTIONS TO BE TAKEN WHEN INFLATING THE TIRES....805
      2.8.21 PRECAUTIONS TO BE TAKEN WHEN USING THE SYNTHETIC BIODEGRADABLE OIL TYPE HEES....806
  THE MACHINE AND ITS OPERATIONS....808
    3.1 SAFETY LOCKS....809
      3.1.1 LOADER ARM SUPPORT....809
      3.1.2 BACKHOE LOCKS (if installed)....811
      3.1.3 COLD PLANER LOCKS (if installed)....813
    3.2 GENERAL VIEWS....814
      3.2.1 FRONT GENERAL VIEW....814
      3.2.2 REAR GENERAL VIEW....815
      3.2.3 CAB INSIDE GENERAL VIEW....816
    3.3 INSTRUMENTS AND CONTROLS....818
      3.3.1 INSTRUMENTS....818
      3.3.2 INDICATOR LIGHTS....820
      3.3.3 SWITCHES AND PUSH BUTTONS....825
      3.3.4 ELECTRICAL ACCESSORIES....830
      3.3.5 MACHINE CONTROLS....832
    3.4 FUSES AND RELAYS....854
      3.4.1 MACHINE FUNCTION FUSES....854
      3.4.2 MAIN FUSE....855
      3.4.3 RELAYS....856
    3.5 GUARDS AND OPERATORS SEAT....858
      3.5.1 ENGINE HOOD....858
      3.5.2 REAR PANEL....859
      3.5.3 CAB....860
        3.5.3.1 TILTING THE CAB....861
      3.5.4 STANDARD SEAT....863
      3.5.5 CUSHIONED SEAT....863
      3.5.6 SEAT BELT....864
      3.5.7 EMERGENCY EXIT....864
      3.5.8 TECHNICAL DOCUMENTATION CASE....865
      3.5.9 FIRE EXTINGUISHER....865
      3.5.10 FIRST AID KIT....865
    3.6 USE OF THE MACHINE....866
      3.6.1 CHECKS BEFORE STARTING THE ENGINE....866
        3.6.1.1 VISUAL CHECKS....866
        3.6.1.2 DAILY CHECKS....866
        3.6.1.3 OPERATIONAL CHECKS....867
      3.6.2 STARTING THE ENGINE....868
        3.6.2.1 STARTING WITH WARM ENGINE OR IN TEMPERATE CLIMATES....868
        3.6.2.2 STARTING WITH COLD ENGINE OR IN COLD CLIMATES....869
      3.6.3 WARMING THE ENGINE....870
      3.6.4 HEATING THE HYDRAULIC OIL....870
      3.6.5 HOW TO MOVE THE MACHINE (ISO PATTERN CONTROL SYSTEM)....870
        3.6.5.1 STEERING (CHANGING DIRECTION)....872
      3.6.6 HOW TO MOVE THE MACHINE (OPTIONAL PATTERN CONTROL SYSTEM)....874
        3.6.6.1 STEERING (CHANGING DIRECTION)....876
      3.6.7 MOVING ON SLOPES....878
      3.6.8 MAXIMUM IMMERSION DEPTH....879
    3.8 STOPPING THE ENGINE....882
    3.7 PARKING THE MACHINE....880
      3.7.1 PARKING ON LEVEL GROUND....880
      3.7.2 PARKING ON SLOPES....881
    3.9 TRANSPORTING THE MACHINE ON OTHER VEHICLES....883
      3.9.1 LOADING AND UNLOADING THE MACHINE....883
      3.9.2 TRANSPORT....884
    3.10 HOW TO LIFT THE MACHINE....885
    3.11 PRECAUTIONS TO BE TAKEN IN THE COLD SEASON....886
      3.11.1 FUEL AND LUBRICANTS....886
      3.11.2 COOLANT....886
      3.11.3 BATTERY....887
      3.11.4 OTHER PRECAUTIONS....887
      3.11.5 PRECAUTIONS TO BE TAKEN AT THE END OF WORK....887
    3.12 PRECAUTIONS TO BE TAKEN IN THE WARM SEASON....888
    3.13 USING THE WORK EQUIPMENT....889
      3.13.1 LOWERING THE EQUIPMENT IN CASE OF MACHINE FAILURE....889
      3.13.2 ORGANIZING THE WORK AREA....890
      3.13.3 LOADING MATERIAL ON HEAPS AND ON LEVEL SURFACES....891
      3.13.4 LOADING MATERIAL ON SLOPES....892
      3.13.5 DIGGING METHOD....893
      3.13.6 CHANGING THE BUCKET OR ATTACHMENT WITH STANDARD QUICK COUPLER....894
        3.13.6.1 REMOVING THE BUCKET OR ATTACH MENT....895
        3.13.6.2 ATTACHING THE BUCKET....896
        3.13.6.3 CHECKING THE POSITION OF THE LOCKING PINS....897
        3.13.6.4 ADJUSTING THE LOCKING PINS....898
      3.14 LONG PERIODS OF INACTIVITY....899
        3.14.1 BEFORE THE PERIOD OF INACTIVITY....899
        3.14.2 DURING THE PERIOD OF INACTIVITY....900
        3.14.3 AFTER THE PERIOD OF INACTIVITY....900
      3.15 TROUBLESHOOTING....901
        3.15.1 HOW TO REMOVE THE MACHINE....901
        3.15.2 IF THE FUEL HAS BEEN COMPLETELY DEPLETED....901
        3.15.3 IF THE BATTERY IS DEPLETED....902
          3.15.3.1 STARTING WITH BOOSTER CABLES....903
        3.15.4 OTHER TROUBLES....904
          3.15.4.1 ELECTRICAL CIRCUIT....904
          3.15.4.2 HYDRAULIC SYSTEM....905
          3.15.4.3 ENGINE....905
          3.15.4.4 HYDROSTATIC TRANSMISSION....906
  MAINTENANCE....908
    4.1 GUIDE TO MAINTENANCE....909
    4.2 MAINTENANCE NOTES....911
      4.2.1 NOTES REGARDING THE ENGINE....911
        4.2.1.1 ENGINE OIL....911
        4.2.1.2 COOLANT....911
      4.2.2 NOTES REGARDING THE HYDRAULIC SYSTEM....912
      4.2.3 NOTES REGARDING THE ELECTRICAL SYSTEM....912
      4.2.4 NOTES REGARDING LUBRICATION....913
      4.2.5 PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING....914
    4.3 FUEL, COOLANT AND LUBRICANTS....915
      4.3.1 APPROVED SYNTHETIC BIODEGRADABLE LUBRICANTS TYPE HEES....919
    4.4 DRIVING TORQUES FOR SCREWS AND NUTS....920
      4.4.1 STANDARD DRIVING TORQUES....920
      4.4.2 SPECIFIC DRIVING TORQUES....920
    4.5 LUBRICATION....921
      4.5.1 LUBRICATION DIAGRAM....921
    4.6 PERIODICAL CHANGE OF THE COMPONENTS CONNECTED WITH SAFETY....922
      4.6.1 CRITICAL PARTS FOR SAFETY....923
    4.7 MAINTENANCE PLAN....929
    4.8 MAINTENANCE PROCEDURE....931
      4.8.1 WHEN REQUIRED....931
        4.8.1.a CHECKING, CLEANING OR CHANGING THE AIR CLEANER CARTRIDGE....931
        4.8.1.b TIRE ROTATION....932
        4.8.1.c DRAINING THE FUEL TANK....933
        4.8.1.d RELEASING THE PARKING BRAKE....934
        4.8.1.e CHECKING THE BATTERY CHARGE LEVEL....935
      4.8.2 CHECKS BEFORE STARTING....936
        4.8.2.a VARIOUS CHECKS....936
        4.8.2.b CHECKING THE COOLANT LEVEL....936
        4.8.2.c CHECKING THE FUEL LEVEL....937
        4.8.2.d CHECKING THE ENGINE OIL LEVEL....938
        4.8.2.e CHECKING THE OIL LEVEL IN THE HYDRAULIC CIRCUIT....939
        4.8.2.f CHECKING THE WATER SEPARATOR FOR SEDIMENTS AND WATER....940
        4.8.2.g CHECKING THE WIRING SYSTEM....940
      4.8.3 MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION....941
      4.8.4 MAINTENANCE EVERY 50 HOURS OF OPERATION....941
        4.8.4.a CHECKING THE TIRE PRESSURE....941
        4.8.4.b CHECKING THE COOLANT LEVEL IN THE RADIATOR....941
      4.8.5 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION....942
      4.8.6 MAINTENANCE EVERY 250 HOURS OF OPERATION....942
        4.8.6.a ADJUSTING THE FAN BELT TENSION....942
        4.8.6.b CHECKING THE GEARING CHAIN TEN SION....943
        4.8.6.c CLEANING THE OUTSIDE OF THE RADIATORS....945
        4.8.6.d CHECKING THE WHEEL NUT DRIVING TORQUE....945
        4.8.6.e CHECKING THE OIL LEVEL IN THE FINAL TRANSMISSIONS....946
        4.8.6.f LUBRICATING THE JOINTS....947
        4.8.6.g CHANGING THE ENGINE OIL....948
        4.8.6.h CHANGING THE ENGINE OIL FILTER....949
      4.8.7 MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines filled with synthetic biodegradable oil type HEES)....950
      4.8.8 MAINTENANCE EVERY 500 HOURS OF OPERATION....950
        4.8.8.a CHANGING THE FUEL FILTER....950
        4.8.8.b CHANGING THE HYDRAULIC OIL DRAIN FILTER....952
        4.8.8.c CLEANING THE WATER SEPARATOR....953
        4.8.8.d DRAINING THE HYDRAULIC OIL TANK (Only for machines filled with synthetic biodegradable oil type HEES)....954
      4.8.9 MAINTENANCE EVERY 1000 HOURS OF OPERATION....956
        4.8.9.a CHANGING THE OIL IN THE FINAL TRANSMISSION....956
        4.8.9.b CHANGING THE HYDRAULIC SYSTEM OIL AND CLEANING THE SUCTION FIL TER....957
        4.8.9.c CHECKING AND ADJUSTING THE ENGINE VALVE CLEARANCE....959
      4.8.10 MAINTENANCE EVERY 2000 HOURS OF OPERATION....960
        4.8.10.a CHANGING THE COOLANT....960
        4.8.10.b CHANGING THE SUCTION FILTER....961
        4.8.10.c CHECKING THE ALTERNATOR AND THE STARTER....962
  TECHNICAL SPECIFICATIONS....964
    5.1 TECHNICAL DATA....965
      5.1.1 STANDARD MACHINE OVERALL DIMENSIONS....965
      5.1.2 MACHINE OVERALL DIMENSIONS WITH OPTIONAL EQUIPMENT....966
      5.1.3 TECHNICAL CHARACTERISTICS....967
  AUTHORIZED OPTIONAL EQUIPMENT....970
    6.1 AUTHORIZED OPTIONAL EQUIPMENT....971
      6.1.1 PRECAUTIONS REGARDING SAFETY....971
      6.1.2 PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT....971
      6.1.3 CHARACTERISTICS OF THE STANDARD MACHINE OPTIONAL EQUIPMENT....972
      6.1.4 CHARACTERISTICS OF THE OPTIONAL EQUIPMENT OF THE MACHINE VERSION WITH SUPER-FLOW HYDRAULIC SYSTEM....973
    6.2 CHANGING THE AUTHORIZED EQUIPMENT....974
      6.2.1 CONNECTING THE BACKHOE....974
      6.2.2 CONNECTING THE HYDRAULIC CIRCUIT....975
      6.2.3 CONNECTING THE RETURN CIRCUIT WITH DIRECT DRAINAGE INTO THE TANK....977
      6.2.4 PREPARING THE MACHINE FOR THE USE OF THE BACKHOE....978
      6.2.5 USING THE MACHINE WITH THE BACKHOE....978
    6.3 PALLET FORKS....979
    6.4 HAND & FOOT CONTROL SYSTEM....980
      6.4.1 MACHINE CONTROLS....980
        6.4.1.1 TRAVEL AND STEERING CONTROL LEVERS....981
        6.4.1.2 WORK EQUIPMENT CONTROL PEDALS (LOADER ARM AND BUCKET)....983
        6.4.1.3 AUXILIARY HYDRAULIC CONTROL LEVER....986
      6.4.2 HOW TO MOVE THE MACHINE (HAND & FOOT CONTROL SYSTEM)....989
        6.4.2.1 STEERING (CHANGING DIRECTION)....991
WEBM005300 - Skid Steer Loader SK1020-5, SK1020-5 turbo Shop Manual....994
  COVER....994
  CONTENTS....995
  SAFETY....998
  FOREWORD....1000
    HOW TO READ THE SHOP MANUAL....1001
    HOISTING INSTRUCTIONS....1002
    STANDARD TIGHTENING TORQUE....1003
    COATING MATERIALS....1005
    WEIGHT TABLE....1007
    TABLE OF OIL AND COOLANTS QUANTITIES....1008
    CONVERSION TABLE....1010
  10 STRUCTURE AND FUNCTION....1018
    P.T.O....1019
    POWER TRAIN....1020
    TRANSMISSION....1021
    FINAL DRIVE....1023
    HYDRAULIC CIRCUIT....1030
    CONTROL VALVE  (3-SPOOL)....1049
    CONTROL VALVE (4-SPOOL)....1052
    CLSS....1056
    SOLENOID VALVE....1064
    ACCUMULATOR....1066
    PATTERN CHANGE VALVE....1067
    R.H. PPC VALVE (STANDARD)....1071
    R.H. PPV VALVE (PATTERN CHANGE)....1075
    L.H. PPC VALVE (STANDARD)....1079
    L.H. PPC VALVE (PATTERN CHANGE)....1083
    CYLINDERS....1087
    ELECTRICAL DIAGRAM (ENGINE LINE)....1088
    ELECTRICAL DIAGRAM (FRAME LINE STANDARD) ....1092
    ELECTRICAL DIAGRAM (FRAME LINE OPTIONAL)....1096
    ELECTRICAL DIAGRAM (CABIN LINE STANDARD) ....1100
    ELECTRICAL DIAGRAM (CABIN LINE OPTIONAL)....1106
    ELECTRICAL DIAGRAM (TOP-CABIN LIGHT LINE)....1114
  20 TESTING AND ADJUSTMENTS....1116
    NORMAL OR STANDARD TECHNICAL DATA....1117
    SPECIAL TOOLS....1129
    CHECKING THE ENGINE SPEED....1130
    ADJUSTMENT OF VALVE CLEARANCE....1131
    MEASUREMENT OF THE COMPRESSION PRESSURE....1133
    CONTROL AND ADJUSTMENT OF THE FAN BELT TENSION....1134
    CONTROL AND ADJUSTMENT OF THE INJECTION TIMING....1135
    CHECKING ENGINE OIL PRESSURE....1137
    ADJUSTING THE STROKE OF THE ACCELERATOR CABLES....1138
    REGULATION OF PPC VALVES' DRIVE PRESSURE....1139
    ADJUSTMENT OF THE PPC VALVE CLEARANCES....1141
    ADJUSTING THE POSITION OF THE SERVO-CONTROL ENGAGEMENT SAFETY SENSOR....1142
    TESTING AND ADJUSTMENT OF GEARING CHAIN TENSION....1143
    CONTROL AND REGULATION OF THE PRESSURES IN THE HYDRAULIC CIRCUITS....1144
    TESTING THE HYDRAULIC PUMP....1145
    VALVE CALIBRATION....1146
    CHECKING THE TRAVEL DEVIATION....1148
    CONTROL VALVE....1150
    CONTROL AND REGULATION OF THE SERVO-CONTROL POWER SUPPLY....1151
    ELIMINATION OF RESIDUAL PRESSURES - PRESSURIZATION OF THE TANK....1153
    BLEEDING AIR FROM THE HYDRAULIC CIRCUITS....1154
  30 REMOVAL AND INSTALLATION....1156
    HOW TO READ THE MANUAL....1158
    PRECAUTIONS TO BE TAKEN WHILE WORKING....1159
    ENGINE HOOD....1160
      REMOVAL AND INSTALLATION....1160
    CAB....1161
      TILTING....1161
      LOWERING....1164
    BATTERY....1165
      REMOVAL AND INSTALLATION....1165
    STARTING MOTOR....1166
      REMOVAL AND INSTALLATION....1166
    ALTERNATOR....1167
      REMOVAL AND INSTALLATION....1167
    AIR INTAKE FILTER....1168
      REMOVAL AND INSTALLATION....1168
    MUFFLER (SK1050-5)....1169
      REMOVAL....1169
      INSTALLATION....1170
    MUFFLER (SK1020-5 TURBO)....1171
      REMOVAL....1171
      INSTALLATION....1172
    VALVE COVER....1173
      REMOVAL....1173
      INSTALLATION....1174
    NOZZLE....1175
      REMOVAL....1175
      INSTALLATION....1175
    INJECTION PUMP....1176
      REMOVAL....1176
      INSTALLATION....1178
    CYLINDER HEAD....1179
      REMOVAL....1179
      INSTALLATION....1181
    TURBOCHARGER (SK1020-5 TURBO)....1182
      REMOVAL AND INSTALLATION....1182
    COOLANT LIQUID PUMP....1183
      REMOVAL AND INSTALLATION....1183
    RADIATOR GROUP....1184
      REMOVAL....1184
      INSTALLATION....1185
    FUEL TANK....1186
      REMOVAL....1186
      INSTALLATION....1187
    CAB....1188
      REMOVAL....1188
      INSTALLATION....1191
    ENGINE-PUMP GROUP....1192
      REMOVAL....1192
      INSTALLATION....1195
    COMPLETE HYDRAULIC PUMP....1196
      REMOVAL....1196
      INSTALLATION....1198
    GEAR PUMP....1199
      REMOVAL AND INSTALLATION....1199
    ENGINE-PUMP COUPLING....1200
      REMOVAL AND INSTALLATION....1200
    CONTROL VALVE....1201
      REMOVAL AND INSTALLATION....1201
    PPC VALVES....1202
      REMOVAL AND INSTALLATION....1202
    HEATING FAN....1203
      REMOVAL....1203
      INSTALLATION....1204
    HUB WHEEL....1205
      REMOVAL....1205
      INSTALLATION....1206
      DISMANTLING....1207
      ASSEMBLY....1208
    FINAL DRIVE....1209
      REMOVAL....1209
      INSTALLATION....1210
    RAISING CYLINDER....1211
      REMOVAL AND INSTALLATION....1211
    BUCKET CYLINDER....1212
      REMOVAL....1212
      INSTALLATION....1213
      DISASSEMBLY....1214
      ASSEMBLY....1216
    COMPLETE WORKING EQUIPMENT....1220
      REMOVAL....1220
      INSTALLATION....1221
    WORKING EQUIPMENT SUPPORT FRAME....1222
      REMOVAL AND INSTALLATION....1222
  40 STANDARD MAINTENANCE....1224
    P.T.O....1225
    TRANSMISSION....1226
    FINAL DRIVE....1227
    HYDRAULIC PUMP....1228
    CONTROL VALVE (SUPER HIGH-FLOW VERSION)....1230
    R.H. PPC VALVE....1236
    L.H. PPC VALVE (STANDARD)....1237
    L.H. PPC VALVE (PATTERN CHANGE)....1238
    PATTERN CHANGE VALVE....1239
    CYLINDERS....1240
    WORKING EQUIPMENT....1241

Logo